|本期目录/Table of Contents|

[1]崔铁军,马云东.基于FLAC3D的盾构隧道施工过程建模影响因素分析[J].中国安全生产科学技术,2013,9(10):15-20.[doi:10.11731/j.issn.1673-193x.2013.10.003]
 CUI Tei jun,MA Yun dong.Analysis on influence factors of modeling for construction process of shield tunnel based on FLAC3D[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(10):15-20.[doi:10.11731/j.issn.1673-193x.2013.10.003]
点击复制

基于FLAC3D的盾构隧道施工过程建模影响因素分析
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
9
期数:
2013年10期
页码:
15-20
栏目:
学术论著
出版日期:
2013-10-30

文章信息/Info

Title:
Analysis on influence factors of modeling for construction process of shield tunnel based on FLAC3D
作者:
崔铁军123马云东2
(1. 辽宁工程技术大学 安全科学与工程学院,辽宁阜新123000; 2. 大连交通大学 辽宁省隧道与地下结构工程技术研究中心, 大连116028; 3. 沈阳华慧科技有限公司,辽宁沈阳110000)
Author(s):
CUI Teijun123 MA Yundong2
(1.College of Safety Science and Engineering, Liaoning Technical University, Fuxin Liaoning 123000, China; 2. Tunnel & Underground Structure Engineering Center of Liaoning, Dalian Jiaotong University, Dalian Liaoning 116028, China; 3. Shenyang China WitTech Company, Shenyang Liaoning 110000, China)
关键词:
盾构施工建模FLAC3D模拟傅里叶变换影响因素分析
Keywords:
onstruction process simulation of shield tunnel FLAC3D simulation Fourier transform influence factors analysis
分类号:
U231+.96;X9134
DOI:
10.11731/j.issn.1673-193x.2013.10.003
文献标志码:
A
摘要:
基于FLAC3D对盾构隧道施工过程模拟,研究建模影响因素及其影响程度。首先,综合隧道开挖过程中盾构机前体与岩土层间相互作用的影响因素来模拟隧道开挖过程,确定地表沉降和隧道垂直(Z)方向应力;然后,分别模拟去除其中一种因素后的隧道开挖过程,并求出相应的地表沉降和隧道垂向应力;最后,基于傅里叶变换对各种情况下的地表沉降量和应力应变状况进行比较分析,找出各因素对建模的影响程度,从而为利用FLAC3D进行盾构隧道施工模拟时的影响因子的选择提供参考。研究结果表明:一方面,建模过程中的各种因素对地表沉降的影响大于对隧道Z向压力影响;另一方面,盾构机推进给作业面土体压力、盾尾灌浆延迟于管片拼装造成的暂时对土体支护力不足、盾构机刀盘转动给作业面土体的扭力等因素对模型解算造成的影响最大。
Abstract:
The influence factors and impact of modeling for construction process simulation of shield tunnel based on FLAC3D were studied. Firstly, by integrating the influence factors of interaction between the shield machine precursor and rock and soil, the process of tunnel excavation was simulated to determine the surface subsidence and tunnel vertical(Z) stress; Secondly, the process of tunnel excavation after removal of one factor was simulated respectively, and the corresponding surface subsidence and tunnel vertical stress were derived; Finally, the quantity of surface subsidence and the stress and strain status under various conditions were compared and analyzed based on Fourier transform. The impact of each factor on modeling was found out, so as to provide reference for the selection of influence factors when simulating the construction process of shield tunnel by FLAC3D. The results showed that on the one hand, the influence of various factors on surface subsidence were larger than that on tunnel vertical(Z) stress in modeling process; on the other hand, the following factors made the greatest impact on the model solution: the pressure on work surface soil by shield machine advancing, the temporary insufficient supporting capacity to soil by delaying of shield tail grouting to segment erection, and the torque to work surface soil by cutter rotation of shield machine.

参考文献/References:

[1]黄清飞. 砂卵石地层盾构刀盘刀具与土相互作用及其选型设计研究[D].北京:北京交通大学,2010:4247
[2]沈建奇. 盾构掘进过程数值模拟方法研究及应用[D].上海:同济大学,2009:5291
[3]乔金丽. 盾构隧道开挖面的稳定性分析[D].天津:天津大学,2008
[4]李君. 盾构开挖面稳定性理论与试验研究[D].浙江:浙江大学,2010
[5]黄腾,郑玉华,郭志明. 南京长江二桥八卦洲引线路基沉降观测和数据分析[J]. 测绘工程,2003,(3):4446 HUANG Teng,ZHENG Yuhua,GUO Zhiming.The settlement observation and data analysis of the second nanjing yangtse river bridge bagua continent’s roadbed[J]. Engineering of Surveying and Mapping.2003,(3):4446
[6]马良药,田传让,江泉.简谐振动条件下岩块水泥砂浆块的静动摩擦系数[J]. 岩土工程学报,1994,(3):8891 MA Liangyao,TIAN Chuanrang,JIAN Quan. Simple harmonic oscillator conditions cement mortar blocks of rock static frictional coefficient[J]. Chinese Journal of Geotechnical Engineering,1994,(3):8891
[7]王坚,高井祥,郑南山.基于小波理论的沉降监测数据序列分析[J].大地测量与地球动力学, 2005, 25(4) WANG Jian,GAO Jingxiang,ZHENG Nanshan. Montored subsidence time series analysis based on wavelet theory[J]. Journal of Geodesy and Geodynamics, 2005, 25(4)
[8]丛志鹏. 基于曲线拟合方法的故障测距应用研究[D].济南:山东大学,2008:3043
[9]王洪德,崔铁军. 厚硬岩层盾构隧道施工对地下管线影响分析[J]. 地下空间与工程学报,2013,9(2):333338 WANG Hongde,CUI Tiejun. Analysis on influence of shield tunneling crossing thick and hard rock on buried pipeline[J]. Chinese Journal of Underground Space and Engineering,2013,9(2):333338
[10]王洪德,秦玉宾,崔铁军,等. 深基坑围护结构变形远程监测预警系统[J]. 辽宁工程技术大学学报(自然科学版), 2013,32(1):1418 WANG Hongde, QIN Yubin, CUI Teijun, et al. Longdistance monitoring and earlywarning system for support structure deformation at deep foundation pit[J]. Journal of Liaoning Technical University(Natural Science), 2013,32(1):1418
[11]王洪德,崔铁军,马云东. 深基坑施工过程仿真及地表沉降量验证[J]. 辽宁工程技术大学学报(自然科学版),2012,31(6):810813 WANG Hongde, CUI Tiejun, MA Yundong. Simulation of deep excavation process and verification analysis of ground surface settlement[J]. Journal of Liaoning Technical University(Natural Science),2012,31(6):810813

相似文献/References:

[1]崔铁军,马云东.基于土压平衡盾构施工的双层地铁隧道引起地面沉降分析[J].中国安全生产科学技术,2013,9(12):78.[doi:10.11731/j.issn.1673-193x.2013.12.013]
 CUI Tie jun,MA Yun dong.Study on surface settlement predictions for double layer metro tunnels excavated by EPBTBM[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(10):78.[doi:10.11731/j.issn.1673-193x.2013.12.013]

备注/Memo

备注/Memo:
国家自然科学基金项目资助(5105003);大连市科技计划项目资助(2011E15SF118)
更新日期/Last Update: 2013-10-30