[1]郭社锋,高德彬,敬麒麟.模糊综合评判法在西部地区高速公路施工现场安全评判中的应用[J].中国安全生产科学技术,2011,7(6):43-48.
 GUO She-feng,GAO De-bin,JING Qi-lin.Study on safety assessment method?for highway site construction in western China based on fuzzy comprehensive evaluation method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(6):43-48.
点击复制

模糊综合评判法在西部地区高速公路施工现场安全评判中的应用()
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
7
期数:
2011年6期
页码:
43-48
栏目:
学术论著
出版日期:
2011-06-30

文章信息/Info

Title:
Study on safety assessment method?for highway site construction in western China based on fuzzy comprehensive evaluation method
文章编号:
1673-193X(2011)-06-0043-06
作者:
郭社锋1高德彬2敬麒麟1
1.新疆交通职业技术学院,乌鲁木齐 831401
2.长安大学,西安 710054
Author(s):
GUO She-feng1 GAO De-bin2 JING Qi-lin1
1. Xinjiang Vocational and Technical College, Urumqi? 831401, China
2. Chang’an University, Xi’an? 710054, China
关键词:
模糊综合评判三标度法最优传递矩阵改进的AHP施工现场安全状况评判
Keywords:
fuzzy comprehensive evaluationthree-standard degree methodoptimal transfer matriximproved AHPconstruction site safety assessment
分类号:
X913.4
DOI:
-
文献标志码:
A
摘要:
目前随着高速公路建设的飞速发展,引发了施工现场的安全管理难度剧增,及时、正确地掌握和评判施工现场安全状况是预防和控制安全事故发生的有效途径。但公路施工领域安全评判涉及的因素很多,模糊性大、动态变化复杂是最显著的特性,因素之间互相作用使结果可变性很大,如何对受多种因素制约的事物或对象做出一个总体的评价是目前一个很重要的问题。模糊综合评判法可把定性评价转化为定量评价,能较好地解决模糊的、难以量化的问题。但由于该法使用的评语常带有模糊性,各影响因素的权重通常是专家凭经验给出,从而影响评判结果的客观性。而层次分析法适用于多方案或多目标的决策,可将定性与定量的分析相结合,可以减少评价中因主观性所带来的弊端,使评价结果更可信。本文在研究模糊综合评判法和层次分析法优缺点的基础上,将二者结合起来,建立西部地区高速公路施工现场安全状况评价的模型,利用该模型得出公路施工现场安全状况,为施工现场的安全管理和事故防治提供依据。
Abstract:
Currently, the rapid development of highway construction causes more difficulties to the safety management of site construction, promptly and correctly assessing the safety state of site construction is a key way to prevent and control highway construction accidents. In view of the fact that safety assessment for highway construction involves many factors and possesses the characteristics of big fuzziness, dynamics, complexity, and uncertainty of results caused by the interaction of factors, how to make an overall safety assessment for highway construction affected by many factors is a very important problem. Fuzzy Comprehensive Assessment Method (FCAM) can be put into a quantitative evaluation of qualitative evaluation, can deal with vague, difficult to quantify the problem. But the weight of each factor based on expert’s experience and the fuzziness of the assessing set in this method reduces the objectivity of the final result. AHP (Analytic Hierarchy Process), as a combination method of qualitative and quantitative analysis, is fit for solving the problem of multi-objective or multi-scheme decision and reduces the subjectivity, which makes the final assessment result more credible. Considering the above reasons, a model for assessing the safety state of highway site construction in western China is set up based on FCAM and AHP, which preferably considers the fuzziness of assessing process and reduces the subjectivity. The safety state of highway site construction gotten by this model can provide great reference for the safety management and accident prevention of site construction.

参考文献/References:

[1] 中国交通建设监理协会.《交通建设工程安全监理》交通建设工程监理培训教材[M]. 北京:人民交通出版社, 2007:17-25.[2] 郭金玉,张忠彬,孙庆云. 层次分析法在安全科学研究中的应用[J]. 中国安全生产科学技术,2008,4(2):70-74.Guo Jin-yu,Zhang Zhong-bin, Sun Qing-yun. Applications of AHP method insafety science[J]. Journal of Safety Science and Technology,2008,4(2):70-74.[3] 郭金玉,张忠彬,孙庆云. 层次分析法的研究与应用[J]. 中国安全科学学报, 2008,18(5):148-153.Guo Jin-yu,Zhang Zhong-bin, Sun Qing-yun. Study and applications of analytic hierarchy process[J]. China Safety Science Journal, 2008,18(5):148-153.[4] 黄小美,李百战,彭世尼,等. 基于层次分析和模糊综合评判的管道风险评价[J]. 煤气与热力,2008,28(2):13-18.[5] 张晓平. 模糊综合评判理论与应用研究进展[J]. 山东建筑工程学院学报,2003,18(4):90-94.[6] 邱菀华. 现代项目风险管理方法与实践[M]. 北京:科学出版社,2003.[7] 胡海军,程光旭,禹盛林. 一种基于层次分析法的危险化学品源安全评价综合模型[J]. 安全与环境学报,2007,7(3):141-144.[8] 曲生. 层次分析法的改进及在安全决策中应用的研究[J]. 中国安全生产科学技术,2009,5(5):111-114.Qu Sheng. Research about improving AHP and applying to security decision field[J].Journal of Safety Science and Technology,2009,5(5):111-114.[9] 常建娥,蒋太立.层次分析法确定权重的研究[J].武汉理工大学学报(信息与管理工程版),2007,29(1):.153-156. [10] 苏光辉,侍克斌,周峰. 基于改进的AHP法的施工方案多目标优选决策研究[J]. 水利科技与经济, 2009,15(10):867-869,872.[11] 中华人民共和国建设部. JGJ/T77-2003.施工企业安全生产评价标准[S],2003 [12] 中华人民共和国交通部. JTJ076-1995.公路工程安全施工技术规程[S],1995 [13] 张永琴. 高速公路施工安全管理研究[D]. 重庆:重庆大学,2009.4

相似文献/References:

[1]鲍学英,王起才,宫文昌.基于模糊层次分析法的地铁工程施工安全评价[J].中国安全生产科学技术,2013,9(1):136.
 BAO Xue ying,WANG Qi cai.Study on safety assessments of metro constructions using fuzzy analytic hierarchy process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(6):136.
[2]郭江雁,臧必鹏,梁晖,等.基于模糊综合评判的电网应灾能力量化评估*[J].中国安全生产科学技术,2021,17(3):117.[doi:10.11731/j.issn.1673-193x.2021.03.018]
 GUO Jiangyan,ZANG Bipeng,LIANG Hui,et al.Quantitative assessment on disaster response capability of power grid based on fuzzy comprehensive evaluation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):117.[doi:10.11731/j.issn.1673-193x.2021.03.018]

备注/Memo

备注/Memo:
收稿日期:2011-03-15
作者简介:郭社锋,硕士,讲师,全国注册安全工程师。
更新日期/Last Update: