[1]刘铁民.安全评价实用指南[M].徐州:中国矿业大学出版社,2007LIU Tiemin. Guidebook of Risk Assessment Techniques[M]. Xuzhou:China University of Mining And Technology Press,2007[2]CIA 1993. A GUIDE TO HAZARD AND OPERABILITY STUDIES[R], Chemical Industries Association,1993.[3]Schlechter. PROCESS RISK ASSESSMENTUSING SCIENCE TO “DO IT RIGHT”[J]. W.Schlechter, International Journal of Pressure Vessels and Piping,1995,v61,n23,479~494.[4]CCPS 1992, GUIDELINES FOR HAZARD EVALUATION PROCEDURES, SECOND EDITION[R]. Centre for Chemical Process Safety, American Institute of Chemical Engineers,1992.[5]H.Ozag, L.M.Bendixen. HAZARD IDENTIFICATION AND QUANTIFICATION[J]. Chemical Engineering Progress,1987,v83,n4,55~64.[6]W.E.Vesely, F.F.Goldberg, N.H.Roberts, D.F.Haasl. FAULT TREE HANDBOOK[M]. Washington:U.S. Nuclear Regulatory Commission,1981.[7]A.W.M.Balemans. CHECKLIST. GUIDE LINES FOR SAFE DESIGN OF PROCESS PLANTS[J]. 1st International Loss Prevention Symposium,1974,7~33.[8]J.L.Hawksley. RISK ASSESSMENT AND PROJECT DEVELOPMENT[10]. The Safety Practitioner,1987,v5,n10,10~16.[9]多英全,魏利军,等.定量风险评价程序初探.中国科技信息,2007,(24):330~331.DUO Yingquan, WEI Lijun, et al. Quantitative Area Risk Assessment Method and its Application in Land Use Safety Planning for Major Hazard Installations[J]. China Science and Technology Information,2007,(24):330~331.[10]Faisal I K, Abbasi S A. Risk analysis of a typical chemical industry using QRA qrocedure[J]. Journal of Loss Prevention in the Process Industries.2001,(14):43~59[11]CASSTQRA V1.0. China Academy of Safety Science & Technology重大危险源区域定量风险评价软件V1.0.中国安全生产科学研究院.[12]P.Andow. GUIDANCE ON HAZOP PROCEDURES FOR COMPUTER CONTROLLED PLANTS[R], HSE contract research report, Her Majestys Stationary Office,1991,No.26[13]J.Lear. COMPUTER HAZARD AND OPERABILITY STUDIES[R], Safety and Reliability of Process Control Systems Symposium, Sydney University Chemical Engineering Association,19931006.