|本期目录/Table of Contents|

[1]杨志冉,柴金飞,方雨菲,等.基于球形模糊-层次分析法的盾构土全生命周期风险评估*[J].中国安全生产科学技术,2025,21(1):109-117.[doi:10.11731/j.issn.1673-193x.2025.01.014]
 YANG Zhiran,CHAI Jinfei,FANG Yufei,et al.Risk assessment of shield soil throughout its full life cycle based on spherical fuzzy-analytic hierarchy process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2025,21(1):109-117.[doi:10.11731/j.issn.1673-193x.2025.01.014]
点击复制

基于球形模糊-层次分析法的盾构土全生命周期风险评估*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
21
期数:
2025年1期
页码:
109-117
栏目:
职业安全卫生管理与技术
出版日期:
2025-01-30

文章信息/Info

Title:
Risk assessment of shield soil throughout its full life cycle based on spherical fuzzy-analytic hierarchy process
文章编号:
1673-193X(2025)-01-0109-09
作者:
杨志冉柴金飞方雨菲周喻
(1.北京科技大学 金属矿山高效开采与安全教育部重点实验室,北京 100083;
2.中国铁道科学研究院集团有限公司 铁道建筑研究所,北京 100081)
Author(s):
YANG Zhiran CHAI Jinfei FANG Yufei ZHOU Yu
(1.Key Laboratory of Ministry of Education for Efficient Mining and Safety of Metal Mine,University of Science and Technology Beijing,Beijing 100083,China;
2.Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China)
关键词:
盾构土全生命周期风险评估球形模糊集层次分析法
Keywords:
shield soil full life cycle risk assessment spherical fuzzy sets analytical hierarchy process
分类号:
X947
DOI:
10.11731/j.issn.1673-193x.2025.01.014
文献标志码:
A
摘要:
为了对盾构土全生命周期风险进行合理评估,以应对其复杂多元的系统工程特性,克服传统评价模型的不足。采用专家评估法构建盾构施工技术、社会、安全、环境、经济等方面的风险层次结构,并利用球形模糊集对其进行成对比较和权重分配,通过去模糊化和归一化处理,建立风险评估模型。研究结果表明:在济南某轨道交通工程中,施工安全、技术、环境、经济和社会风险的权重分别为0.216 2,0.215 5,0.204 3,0.199 0,0.165 0,并识别出资源回收成本高、施工扰民和盾构机适应性不足等高风险因素。研究结果可为盾构施工项目风险管理提供参考。
Abstract:
To reasonably assess the risk of shield soil throughout the full life cycle,addressing its complex and multi-faceted system engineering characteristics and overcoming the limitations of traditional evaluation models,the expert evaluation method was adopted to construct a hierarchical risk structure encompassing the shield construction technology,society,safety,environment,and economy.The pairwise comparisons and weight assignments were conducted using the spherical fuzzy sets,and a risk evaluation model was established through the defuzzification and normalization processing.The results show that in a certain rail transit project in Jinan,the weights of construction safety,technology,environment,economy,and social risks are 0.216 2,0.215 5,0.204 3,0.199 0,0.165 0,respectively.The high-risk factors such as high resource recovery costs,construction disturbances to residents,and insufficient adaptability of shield machine are identified.The research results can provide a reference for the risk management of shield construction projects.

参考文献/References:

[1]朱建才,邓智宝,袁逢逢,等.盾构穿越复合地层机体振动影响因素研究[J].浙江工业大学学报,2022,50(4):435-443. ZHU Jiancai,DENG Zhibao,YUAN Fengfeng,et al.Study on the influencing factors of shield machine vibration when passing through composite strata [J].Journal of Zhejiang University of Technology,2022,50(4):435-443.
[2]PAN H,GOU J,WAN Z,et al.Research on coupling degree model of safety risk system for tunnel construction in subway shield zone [J].Mathematical Problems in Engineering,2019,2019(1):5783938.
[3]安全管理网.南昌地铁1号线一期工程土建二标盾构机刀头磨破盾壳事件[EB/OL].(2019-02-10)[2025-1-10].https://www.safehoo.com/Case/Case/Machine/201902/1552700.shtml?utm_source.
[4]央视网.兰州地铁1号线施工现场发生塌方事故[EB/OL].(2014-04-29)[2025-1-10].https://news.cntv.cn/2014/04/29/ARTI1398738857454719.shtml.
[5]珠海高新技术产业开发区管理委员会.广东省佛山市轨道交通2号线一期工程“2·7”透水坍塌重大事故调查报告[EB/OL].(2018-08-29)[2025-1-10].https://www.zhuhai-hitech.gov.cn/attachment/0/194/194759/2156392.pdf.
[6]黄宏伟,曾明,陈亮,等.基于风险数据库的盾构隧道施工风险管理软件(TRM1.0)开发[J].地下空间与工程学报,2006,2(1):36-41. HUANG Hongwei,ZENG Ming,CHEN Liang,et al.Development of risk management software (TRM1.0) for shield tunnel construction based on risk database [J].Chinese Journal of Underground Space and Engineering,2006,2(1):36-41.
[7]胡群芳,黄宏伟.隧道及地下工程风险接受准则计算模型研究[J].地下空间与工程学报,2006,2(1):60-64. HU Qunfang,HUANG Hongwei.Research on calculation model of risk acceptance criteria for tunnels and underground projects [J].Chinese Journal of Underground Space and Engineering,2006,2(1):60-64.
[8]ISLAM R,NAZIF T H,YUNIARTO A,et al.An empirical study of construction and demolition waste generation and implication of recycling [J].Waste Management,2019,95:10-21.
[9]唐中华,汪浙民,程运信,等.基于层次分析法的隧道工程设计阶段施工安全风险评估[J].中国公路,2021,37(3):88-91. TANG Zhonghua,WANG Zhemin,CHENG Yunxin,et al.Construction safety risk assessment of tunnel engineering design stage based on analytic hierarchy process [J].China Highway,2021,37(3):88-91.
[10]LI H,DENG Q,ZHANG J,et al.Environmental impact assessment of transportation infrastructure in the life cycle:case study of a fast track transportation project in China [J].Energies,2019,12(6):1015.
[11]张顶立,李兵,房倩,等.基于风险系数的海底隧道纵断面确定方法[J].岩石力学与工程学报,2009,28(1):9-19. ZHANG Dingli,LI Bing,FANG Qian,et al.Determination method of longitudinal section of submarine tunnel based on risk factor [J].Chinese Journal of Rock Mechanics and Engineering,2009,28(1):9-19.
[12]WU C,ZHU Z.Analytical method for evaluating the ground surface settlement caused by tail void grouting pressure in shield tunnel construction[J].Advances in Civil Engineering,2018(1):3729143.
[13]XIE X,WANG Q,SHAHROUR I,et al.A real-time interaction platform for settlement control during shield tunnelling construction [J].Automation in Construction,2018,94:154-167.
[14]XU P,XI D.Investigation on the surface settlement of curved shield construction in sandy stratum with laboratory model test [J].Geotechnical and Geological Engineering,2021,39:5493-5504.
[15]LI P,DAI Z,HUANG D,et al.Impact analysis for safety prevention and control of special-shaped shield construction closely crossing multiple operational metro tunnels in shallow overburden [J].Geotechnical and Geological Engineering,2021:1-18.
[16]LIU L,LIU D,WU H,et al.The prediction of metro shield construction cost based on a backpropagation neural network improved by quantum particle swarm optimization [J].Advances in Civil Engineering,2020,2020(1):6692130.
[17]LIEB R H.Materials management at the Gotthard Base Tunnel-Experience from 15 years of construction [J].Geomechanics and Tunnelling,2009,2(5):619-626.
[18]DU L,FENG Y,LU W,et al.Evolutionary game analysis of stakeholders’ decision-making behaviours in construction and demolition waste management [J].Environmental Impact Assessment Review,2020,84:106408.
[19]詹润涛.层次分析法判断矩阵可靠性探讨山[J].数学的实践与认识,2009,39(21):122-128. ZHAN Runtao.Research on the reliability of judgment matrix based on analytic hierarchy process [J].Journal of Mathematics in Practice and Theory,2009,39(21):122-128.
[20]孙锡玉.模糊数学及其应用[M].武汉:武汉大学出版社,2002.
[21]SAMANTR C,DATTA S,MAHAPATRA S S.Fuzzy based risk assessment module for metropolitan construction project:an empirical study [J].Engineering Applications of Artificial Intelligence,2017,65:449-464.
[22]ZADEH L A.Fuzzy sets as a basis for a theory of possibility [J].Fuzzy Sets and Systems,1978,1(1):3-28.
[23]KUTLU G F,KAHRAMAN C.Spherical fuzzy sets and spherical fuzzy TOPSIS method [J].Journal of Intelligent & Fuzzy Systems,2019,36(1):337-352.
[24]SAATY T L.The analytic hierarchy process (AHP) [J].Journal of the Operational Research Society,1980,41(11):1073-1076.
[25]刘吉祥.隧道施工技术风险评估及风险控制措施研究[J].绿色环保建材,2021(7):133-134. LIU Jixiang.Research on risk assessment and risk control measures of tunnel construction technology [J].Green Environmental Protection Building Materials,2021(7):133-134.
[26]王芃.公路交通基础设施投融资现状与改进建议[J].交通科技与管理,2023,4(7):186-188. WANG Peng.Current status and improvement suggestions for investment and financing of highway transportation infrastructure [J].Technology and Management of Transportation System,2023,4(7):186-188.
[27]龚磊.地铁隧道盾构施工安全评价技术研究[J].城市建设理论研究,2024(8):151-153. GONG Lei.Research on safety evaluation technology of subway tunnel shield construction [J].Theoretical Research in Urban Construction,2024(8):151-153.
[28]申鹏.地铁隧道盾构施工安全评价技术研究[D].上海:上海应用技术大学,2020.
[29]杨盼盼.建设项目环境影响评价风险因素及预防策略分析[J].皮革制作与环保科技,2024,5(8):163-165. YANG Panpan.Analysis of risk factors and prevention strategies for environmental impact assessment of construction projects [J].Leather Manufacture and Environmental Technology,2024,5(8):163-165.
[30]苟玉强.建筑工程经济管理风险探析[J].时代金融,2017,4(12):255-258. GOU Yuqiang.Analysis of economic management risks of construction projects [J].Times Finance,2017,4(12):255-258.

相似文献/References:

[1]余忠仁,潘用平,付新,等.三维地理应急系统在含硫气田开发过程中的建设与应用[J].中国安全生产科学技术,2016,12(5):127.[doi:10.11731/j.issn.1673-193x.2016.05.022]
 YU Zhongren,PAN Yongping,FU Xin,et al.Research on construction and application of 3D GIS【Geographic Information System】 Emergency System in the process of sulfur Gas Field Development[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(1):127.[doi:10.11731/j.issn.1673-193x.2016.05.022]
[2]冯晓东,张圣柱,王如君,等.加拿大油气管道安全管理体系及其启示[J].中国安全生产科学技术,2016,12(6):180.[doi:10.11731/j.issn.1673-193x.2016.06.032]
 FENG Xiaodong,ZHANG Shengzhu,WANG Rujun,et al.Study on safety management system of oil and gas pipeline in Canada and its implications[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(1):180.[doi:10.11731/j.issn.1673-193x.2016.06.032]
[3]郭放,段梦兰,张龙.基于全生命周期的海洋油气项目集风险管理[J].中国安全生产科学技术,2019,15(3):148.[doi:10.11731/j.issn.1673-193x.2019.03.024]
 GUO Fang,DUAN Menglan,ZHANG Long.Risk management on offshore oil and gas program based on whole life cycle[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(1):148.[doi:10.11731/j.issn.1673-193x.2019.03.024]

备注/Memo

备注/Memo:
收稿日期: 2024-10-11
* 基金项目: 国家重点研发计划项目(2023YFC3707805)
作者简介: 杨志冉,硕士研究生,主要研究方向为盾构土资源化利用。
通信作者: 周喻,博士,副教授,主要研究方向为岩土工程技术。
更新日期/Last Update: 2025-01-26