[1]HEINRICH H W.Industrial Accident Prevention [M].New York:McGraw-Hill,1941.
[2]CHANG Y J,KHAN F,AHMED S.A risk-based approach to design warning system for processing facilities [J].Process Safety and Environmental Protection,2011,89(5):310-316.
[3]SALZANO E,AGREDA G,CARLUCCIOA,et al.Risk assessment and early warning systems for industrial facilities in seismic zones [J].Reliability Engineering & System Safety,2009,94(10):1577-1584.
[4]陈美龄,侯茜,邬开发,等.钢铁企业生产事故风险预警指标研究 [J].工业安全与环保,2015,12(4):52-55.
CHEN Meiling,HOU Qian,WU Kaifa,et al.Study on risk early warning index for iron and steel enterprises accidents [J].Industrial Safety and Environmental Protection,2015,12(4):52-55.
[5]SARKAR,SOBHAN R,RAHUL V,et al.An optimization-based decision tree approach for predicting slip-trip-fall accidents at work [J].Safety Science,2019,118:57-69.
[6]安全监管总局监督管理四司.国家安全监管总局办公厅关于印发《冶金等工贸行业企业安全生产预警系统技术标准(试行)》的通知[EB/OL].(2014-05-23)[2024-11-20].https://www.mem.gov.cn/gk/gwgg/201405/t20140527_241176.shtml.
[7]全国安全生产标准化技术委员会.企业安全生产标准化基本规范:GB/T 33000—2016[S].北京:中国标准化出版社,2017.
[8]胡长明,刘一衡,黄华,等.风险因素耦合作用下的整体钢平台施工预警方法研究 [J].中国安全生产科学技术,2023,19(9):103-109.
HU Changming,LIU Yiheng,HUANG Hua,et al.Research on early warning method for construction of integrated steel platform under coupling effect of risk factors [J].Journal of Safety Science and Technology,2023,19(9):103-109.
[9]JIANG D Z,GONG J,AKKHIL G.Design of early warning model based on time series data for production safety [J].Measurement,2017,101:62-71.
[10]XU L,GUAN W,ZHANG Z,et al.Design and implementation of the questionnaire WeChat applet for the climate index of SMEs [J].International Conference on Smart Grid and Electrical Automation,2021(4):481-484.
[11]谢汉青,张灿,林其彪,等.基于时间序列的冶金企业安全预警模型研究 [J].安全与健康,2019(7):44-47,49.
XIE Hanqing,ZHANG Can,LIN Qibiao,et al.Research on safety early warning model of metallurgical enterprises based on time series [J].Safety & Health,2019(7):44-47,49.
[12]VAHIDNIA M H,VAHIDI H,HASSANABAD M G,et al.A spatial decision support system based on a Hybrid AHP and TOPSIS method for fire station site selection [J].Journal of Geovisualization and Spatial Analysis,2022(6):30-39.
[13]肖遥,张东胜,董博恺.基于IAHP和模糊综合评判的企业安全风险预警系统研究 [J].北京化工大学学报:自然科学版,2020,47(5):109-117.
XIAO Yao,ZHANG Dongsheng,DONG Bokai.An enterprise safety risk early warning system based on an interval analytic hierarchy process (IAHP) and fuzzy comprehensive evaluation [J].Journal of Beijing University of Chemical Technology (Natural Science),2020,47(5):109-117.
[14]COHEN J.Statistical power analysis for the behavioral sciences [M].New work:Erlbaum Associates,1988.
[15]中华人民共和国应急管理部.安全生产事故隐患排查治理暂行规定[EB/OL].(2007-12-28)[2024-11-20].https://www.mem.gov.cn/gk/zfxxgkpt/fdzdgknr/gz11/200712/t20071228_405675.shtml.
[16]中国政府网.生产安全事故报告和调查处理条例[EB/OL].(2007-04-20)[2024-11-20].https://www.mem.gov.cn/gk/gwgg/agwzlfl/zjl_01/200704/t20070420_233735.shtml.
[17]中国人大网.中华人民共和国安全生产法[EB/OL].(2021-07-16)[2024-11-20].https://www.mem.gov.cn/fw/flfgbz/fg/202107/t20210716_416558.shtml.
[18]NORA S,SAEID R.A modified CRITIC method to estimate the objective weights of decision criteria [J].Knowledge-Based Systems,2022,255:109768.