|本期目录/Table of Contents|

[1]卢福强,张一博,毕华玲.基于需求紧迫度排序的震后伤员转运问题的协同优化研究*[J].中国安全生产科学技术,2024,20(1):37-42.[doi:10.11731/j.issn.1673-193x.2024.01.006]
 LU Fuqiang,ZHANG Yibo,BI Hualing.Reasearch on collaborative optimization of post-earthquake casualty transfer problem based on demand urgency ranking[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2024,20(1):37-42.[doi:10.11731/j.issn.1673-193x.2024.01.006]
点击复制

基于需求紧迫度排序的震后伤员转运问题的协同优化研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
20
期数:
2024年1期
页码:
37-42
栏目:
学术论著
出版日期:
2024-01-31

文章信息/Info

Title:
Reasearch on collaborative optimization of post-earthquake casualty transfer problem based on demand urgency ranking
文章编号:
1673-193X(2024)-01-0037-06
作者:
卢福强张一博毕华玲
(燕山大学 经济管理学院,河北 秦皇岛 066004)
Author(s):
LU Fuqiang ZHANG Yibo BI Hualing
(School of Economics and Management,Yanshan University,Qinhuangdao Hebei 066004,China)
关键词:
地震伤员转运需求紧迫度路径优化自适应遗传算法
Keywords:
earthquake casualty transfer demand urgency routing optimization adaptive genetic algorithm
分类号:
X915.5
DOI:
10.11731/j.issn.1673-193x.2024.01.006
文献标志码:
A
摘要:
为了合理分配应急救援车辆,缩短救援时间,从受灾区域造成的损坏数据出发,利用Critic权重法对受灾点的紧迫度进行排序,基于排序结果构建异构车辆协同优化模型,通过改进自适应遗传算法求解出最优的车辆分配方案,并以2010年玉树“4·14”地震为例,与不考虑需求紧迫度排序的转运方案和考虑紧迫度排序的单一车型转运方案进行对比。研究结果表明:异构车辆协同运送方案使救援总时间减少13.79%,总成本减少13.82%,满意度提高8.33%,验证该模式的高效性和公平性。研究结果可为政府部门制定有效的应急方案提供可靠参考。
Abstract:
In order to reasonably allocate the emergency rescue vehicles and shorten the rescue time,starting from the damage data caused by the affected area,the urgency of the affected points were sorted using the Critic weighting method.A cooperative optimization model of heterogeneous vehicles was constructed based on the sorting results,and the optimal vehicle allocation scheme was solved through the improvement of adaptive genetic algorithm.Taking the the 2010 Yushu “4·14” earthquake as an example,the scheme was compared with the transfer scheme without considering the demand urgency sorting and the single vehicle type transfer scheme considering the demand urgency sorting.The results show that the cooperative transportation scheme of heterogeneous vehicles reduces the total rescue time by 13.79%,reduces the total cost by 13.82%,and improves the satisfaction by 8.33%,which verifies the efficiency and fairness of the model.The results can provide a reliable reference for government departments to develop effective emergency programs.

参考文献/References:

[1]中国政府网.孟加拉国强风暴造成的经济损失超过20亿美元[EB/OL].(2007-11-26)[2023-11-17].https://www.gov.cn/yjgl/2007-11/26/content_815103.htm.
[2]四川地震局.坚强玉树,临风不倒![EB/OL].(2020-04-18)[2023-11-17].https://baijiahao.baidu.com/s?id=1664237456705850236.
[3]SUNG I,LEE T.Optimal allocation of emergency medical resources in a mass casualty incident:patient prioritization by column generation[J].European Journal of Operational Research,2016,252(2):623-634.
[4]VAHDANI B,VEYSMORADI D,MOUSAVI S M,et al.Planning for relief distribution,victim evacuation,redistricting and service sharing under uncertainty[J].Socio-Economic Planning Sciences,2022(80):1-29.
[5]NALAS J,DIAS J.Locating emergency vehicles:modelling the substitutability of resources and the impact of delays in the arrival of assistance[J].Operations Research Perspectives,2021(8):1-15.
[6]LIU H,SUN Y,PAN N,et al.Study on the optimization of urban emergency supplies distribution paths for epidemic outbreaks[J].Computers & Operations Research,2022(146):1-11.
[7]YAN T,LU F,WANG S,et al.A hybrid metaheuristic algorithm for the multi-objective location routing problem in the early post-disaster stage[J].Journal of Industrial and Management Optimization,2023,19(6):4663-4691.
[8]DIAKOULAKI D,MAVROTAS G,PAPAYANNAKIS L.Determining objective weights in multiple criteria problems:the Critic method[J].Computers & Operations Research,1995,22(7):763-770.
[9]KNIGHT V A,HARPER P R,SMITH L.Ambulance allocation for maximal survival with heterogeneous outcome measures[J].Omega,2012,40(6):918-926.
[10]LU F,FENG W,GAO M,et al.The fourth-party logistics routing problem using ant colony system-improved grey wolf optimization[J].Journal of Advanced Transportation,2020(2020):1-15.
[11]CUI H,QIU J,CAO J,et al.Route optimization in township logistics distribution considering customer satisfaction based on adaptive genetic algorithm[J].Mathematics and Computers in Simulation,2023(204):28-42.
[12]MAHJOOB M,FAZELI S S,MILANLOUEI S,et al.A modified adaptive genetic algorithm for multi-product multi-period inventory routing problem[J].Sustainable Operations and Computers,2022(3):1-9.
[13]SRINIVAS M,PATNAIK L M.Adaptive probabilities of crossover and mutation in genetic algorithms [J].IEEE Transactions on Systems,1994,24(4):656-667.
[14]范厚明,孙秀娜,张跃光,等.时变路网下带混合时间窗的车辆路径问题[J].计算机工程与应用,2022,58(16):292-302. FAN Houming,SUN Xiuna,ZHANG Yueguang,et al.Vehicle path problem with mixed time windows under time varying road networks[J].Computer Engineering and Applications,2022,58(16):292-302.
[15]BI H,LU F,DUAN S,et al.Two-level principal agent model for schedule risk control of IT outsourcing project based on genetic algorithm[J].Engineering Applications of Artificial Intelligence,2020(91):1-13.
[16]LU F,BI H,HUANG M,et al.Simulated annealing genetic algorithm based schedule risk management of IT outsourcing project[J].Mathematical Problems in Engineering,2017(2017):1-18.
[17]李媛媛,苏国峰,翁文国,等.地震人员伤亡评估方法研究[J].灾害学,2014,29(2):223-227. LI Yuanyuan,SU Guofeng,WENG Wenguo,et al.Research on earthquake casualty assessment methods[J].Journal of Catastrophology,2014,29(2):223-227.
[18]LIU X,LIU Y,ZHANG L,et al.Mass aeromedical evacuation of patients in an emergency:experience following the 2010 Yushu earthquake[J].The Journal of Emergency Medicine,2013,45(6):865-871.

相似文献/References:

[1]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17.
 ZHANG Dong,WU Zong-zhi,CAI Shi-jing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(1):17.
[2]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10.
 CAI Shi Jing,ZHANG Dong,WU Zong Zhi.Discussion on Tailings Reservoir Dam fuzzy risk assessment model Under Seismic Conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(1):10.
[3]李稳哲,王辉,赵法锁,等.高压输电线铁塔地震时程弹性数值模拟[J].中国安全生产科学技术,2013,9(2):35.
 LI Wen zhe,WANG Hui,ZHAO Fa suo,et al.Numerical simulation on seismic timehistory elastane of highvoltage transmission tower[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(1):35.
[4]谢红梅,赵江平,宋倩文.化工企业地震次生泄漏事故应急及无害化处理[J].中国安全生产科学技术,2010,6(1):134.
 XIE Hong-mei,ZHAO Jiang-ping,SONG Qian-wen.Emergency measures and harmless treatment of secondary leakage on chemical enterprises in the earthquake[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(1):134.
[5]田青芸,马东辉,王威.地震作用下建筑物上部楼层倾倒模式安全距离研究[J].中国安全生产科学技术,2014,10(9):17.[doi:10.11731/j.issn.1673-193x.2014.09.003]
 TIAN Qing-yun,MA Dong-hui,WANG Wei.Study on safety distance of upper structure toppling for buildings under earthquake[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(1):17.[doi:10.11731/j.issn.1673-193x.2014.09.003]
[6]顾一波,霍宇芒.基于贝叶斯网络的地震次生燃气管道泄漏事件链构建[J].中国安全生产科学技术,2016,12(7):134.[doi:10.11731/j.issn.1673-193x.2016.07.024]
 GU Yibo,HUO Yumang.Construction of event chain for secondary gas pipeline leakage induced by earthquake based on Bayesian network[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(1):134.[doi:10.11731/j.issn.1673-193x.2016.07.024]
[7]娄亚龙,刘永,李向阳,等.某铀尾矿库地震和渗流耦合作用下稳定性研究[J].中国安全生产科学技术,2017,13(5):79.[doi:10.11731/j.issn.1673-193x.2017.05.013]
 LOU Yalong,LIU Yong,LI Xiangyang,et al.Study on stability of a certain uranium tailings under coupling effect of earthquake and seepage[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(1):79.[doi:10.11731/j.issn.1673-193x.2017.05.013]
[8]魏利军,王向阳,罗艾民,等.基于Probit-Bayes方法的储罐地震易损性研究[J].中国安全生产科学技术,2017,13(11):17.[doi:10.11731/j.issn.1673-193x.2017.11.003]
 WEI Lijun,WANG Xiangyang,LUO Aimin,et al.Investigation on seismic vulnerability of storage tanks based on Probit-Bayes method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(1):17.[doi:10.11731/j.issn.1673-193x.2017.11.003]
[9]张鹏,王艺环,秦国晋.非随机过程的地震激励下埋地压力管道的非概率可靠性分析[J].中国安全生产科学技术,2018,14(6):134.[doi:10.11731/j.issn.1673-193x.2018.06.021]
 ZHANG Peng,WANG Yihuan,QIN Guojin.Non-probabilistic reliability analysis of buried pressure pipeline under non-random process earthquake excitation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(1):134.[doi:10.11731/j.issn.1673-193x.2018.06.021]
[10]张炜超,郭安宁,孙昱,等.现阶段我国地震应急技术框架分析及评价[J].中国安全生产科学技术,2019,15(11):107.[doi:10.11731/j.issn.1673-193x.2019.11.017]
 ZHANG Weichao,GUO Anning,SUN Yu,et al.Analysis and evaluation of earthquake emergency technology framework at present stage in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(1):107.[doi:10.11731/j.issn.1673-193x.2019.11.017]

备注/Memo

备注/Memo:
收稿日期: 2023-07-12
* 基金项目: 国家重点研发计划项目(2020YFB1712802);河北省高校人文社科重点研究基地科研项目(JJ2208)
作者简介: 卢福强,博士,教授,主要研究方向为物流与供应链管理。
通信作者: 张一博,硕士研究生,主要研究方向为应急物流。
更新日期/Last Update: 2024-02-19