|本期目录/Table of Contents|

[1]崔光耀,克旭,郭艳军,等.强风化炭质板岩地层隧道限阻耗能大变形控制技术研究*[J].中国安全生产科学技术,2023,19(6):98-104.[doi:10.11731/j.issn.1673-193x.2023.06.014]
 CUI Guangyao,KE Xu,GUO Yanjun,et al.Study on large deformation control technology of resistance-limiting and energy-dissipating for tunnel in strongly weathered carbonaceous slate stratum[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(6):98-104.[doi:10.11731/j.issn.1673-193x.2023.06.014]
点击复制

强风化炭质板岩地层隧道限阻耗能大变形控制技术研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
19
期数:
2023年6期
页码:
98-104
栏目:
职业安全卫生管理与技术
出版日期:
2023-06-30

文章信息/Info

Title:
Study on large deformation control technology of resistance-limiting and energy-dissipating for tunnel in strongly weathered carbonaceous slate stratum
文章编号:
1673-193X(2023)-06-0098-07
作者:
崔光耀克旭郭艳军魏杭杭
(1.北方工业大学 土木工程学院,北京 100144;
2.四川电力设计咨询有限责任公司,四川 成都 610041)
Author(s):
CUI Guangyao KE Xu GUO Yanjun WEI Hanghang
(1.School of Civil Engineering,North China University of Technology,Beijing 100144,China;
2.Sichuan Electric Power Design & Consulting Co.,Ltd.,Chengdu Sichuan 610041,China)
关键词:
隧道工程大变形高地应力强风化炭质板岩限阻耗能
Keywords:
tunnel engineering large deformation high ground stress strongly weathered carbonaceous slate resistance-limiting and energy-dissipating
分类号:
X951
DOI:
10.11731/j.issn.1673-193x.2023.06.014
文献标志码:
A
摘要:
为解决高地应力强风化炭质板岩地层隧道大变形技术难题,以某强风化炭质板岩地层隧道大变形处治为研究背景,采用室内试验及数值仿真方法对限阻耗能大变形控制技术进行研究。研究结果表明:反预折纹管结构型式限阻耗能装置承载力与吸能效果均优于其他结构型式装置;将反预折纹管限阻耗能装置施设于钢架后,钢架变形有所减小,隧道衬砌结构整体应力有所降低,安全系数有所增加,监测断面最小安全系数增加15.79%,表明反预折纹管限阻耗能装置可作为高地应力强风化炭质板岩地层隧道大变形环向处治措施。研究结果可为类似工程大变形处治设计提供参考。
Abstract:
In order to solve the technical problem of large deformation of tunnel in the high ground stress and strongly weathered carbonaceous slate stratum,taking the large deformation treatment of a tunnel in the strongly weathered carbonaceous slate stratum as the research background,the large deformation control technology of resistance-limiting and energy-dissipating was studied by using the indoor test and numerical simulation method.The results show that the bearing capacity and energy absorption effect of resistance-limiting and energy-dissipating device with the structure type of counter-prefolding corrugated pipe are better than the devices with other structure types.After installing the resistance-limiting and energy-dissipating device with counter-prefolding corrugated pipe on the steel frame,the deformation of steel frame reduce,the overall stress of tunnel lining structure decreases,and the safety coefficient increases.The minimum safety coefficient of the monitoring section increases by 15.79%,which means that the resistance-limiting and energy-dissipating device with counter-prefolding corrugated pipe can be used as the circumferential treatment measure for the large deformation of tunnel in the high ground stress and strongly weathered carbonaceous slate stratum.The results can provide reference for the large deformation treatment design of similar engineerings.

参考文献/References:

[1]巩江峰,朱勇,张广泽.层状围岩隧道大变形等级判别及处理[J].铁道工程学报,2018,35(12):51-55. GONG Jiangfeng,ZHU Yong,ZHANG Guangze.The grade discrimination of deformation of layered surrounding rock in tunnel and its treatment countermeasures[J].Journal of Railway Engineering Society,2018,35(12):51-55.
[2]徐国文,何川,代聪,等.复杂地质条件下软岩隧道大变形破坏机制及开挖方法研究[J].现代隧道技术,2017,54(5):146-154. XU Guowen,HE Chuan,DAI Cong,et al.Analysis of mechanical behaviors of shallow-buried large-span tunnels under expressways[J].Modern Tunnelling Technology,2017,54(5):146-154.
[3]李峰.高地应力构造破碎带隧道大变形灾变机制及控制技术研究[J].铁道科学与工程学报,2021,18(5):1222-1230. LI Feng.Study on the formation mechanism and large deformation control of tunnel in structural fracture zone with high in-situ stress[J].Journal of Railway Science and Engineering,2021,18(5):1222-1230.
[4]薛晓辉,张军,宿钟鸣,等.高地应力软岩隧道大变形失稳机理及支护对策研究[J].公路,2015,60(3):223-228. XUE Xiaohui,ZHANG Jun,SU Zhongming,et al.Instability mechanism and supporting measure for highway tunnel with high ground stress and soft surrounding rock[J].Highway,2015,60(3):223-228.
[5]祝安龙.高地应力陡倾千枚岩地层铁路隧道大变形机理[J].现代隧道技术,2019,56(S2):231-238. ZHU Anlong.The mechanism of large deformation of a railway tunnel in steeply inclined phyllite strata with high stress[J].Modern Tunnelling Technology,2019,56(S2):231-238.
[6]王明胜.强风化炭质板岩隧道大变形控制技术研究[J].铁道工程学报,2021,38(7):35-39,47. WANG Mingsheng.Research on the large deformation control technology of estrong weathered carbonaceous slate tunnel[J].Journal of Railway Engineering Society,2021,38(7):35-39,47.
[7]陈子全,何川,吴迪,等.高地应力层状软岩隧道大变形预测分级研究[J].西南交通大学学报,2018,53(6):1237-1244. CHEN Ziquan,HU Chuan,WU Di,et al.Study of large deformation classification criterion for layered soft rock tunnels under high grostress[J].Journal of Southwest Jiaotong University,2018,53(6):1237-1244.
[8]王永刚,丁文其,刘志强,等.木寨岭隧道大变形分级标准与支护时机研究[J].地下空间与工程学报,2020,16(4):1116-1122. WANG Yonggang,DING Wenqi,LIU Zhiqiang,et al.Classification standard of large deformation and construction time of second lining in Muzhailing Tunnel[J].Chinese Journal of Underground Space and Engineering,2020,16(4):1116-1122.
[9]陈明福.高应力软岩单线铁路隧道大变形控制技术研究[J].公路,2021,66(11):369-374. CHEN Mingfu.Research on large deformation control technology of high stress soft rock single-track railway tunnel[J].Highway,2021,66(11):369-374.
[10]魏来,刘钦,黄沛.高地应力软岩隧道大变形机理及控制对策研究综述[J].公路,2017,62(7):297-306. WEI Lai,LIU Qin,HUANG Pei.Research progress on large deformation mechanism and control countermeasures of soft rock tunnel in high ground stress[J].Highway,2017,62(7):297-306.
[11]李玉平,田世雄,胡玉琨,等.炭质板岩隧道大变形段“围压拱”支护方案[J].地下空间与工程学报,2020,16(S1):137-146. LI Yuping,TIAN Shixiong,HU Yukun,et al.The bearing structure supporting scheme of the runnel which passes through the carbonaceous slate large deformation section [J].Chinese Journal of Underground Space and Engineering,2020,16(S1):137-146.
[12]曹小平,张云鹏.高地应力板状软岩隧道大变形控制试验研究[J].铁道工程学报,2020,37(1):55-61. CAO Xiaoping,ZHANG Yunpeng.Research on the large deformation controlling of soft slate formation tunnel with high ground dtress[J].Journal of Railway Engineering Society,2020,37(1):55-61.
[13]王刚,龚伦,申志军,等.深埋老黄土隧道限阻耗能型支护方法[J].中国铁道科学,2021,42(4):88-97. WANG Gang,GONG Lun,SHEN Zhijun,et al.Resistance-limiting and energy-dissipating support for deep buried old loess tunnels[J].China Railway Science,2021,42(4):88-97.
[14]仇文革,王刚,龚伦,等.一种适应隧道大变形的限阻耗能型支护结构研发与应用[J].岩石力学与工程学报,2018,37(8):1785-1795. QIU Wenge,WANG Gang,GONG Lun,et al.Research and application of resistance-limiting and energy-dissipating support in large deformation tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2018,37(8):1785-1795.
[15]中华人民共和国交通运输部.公路隧道设计规范 第一册 土建工程:JTG 3370.1—2018[S].北京:人民交通出版社,2019.

相似文献/References:

[1]安永林,蔡海滨,岳健,等.高铁对邻近矿区主井的动力安全影响分析[J].中国安全生产科学技术,2015,11(4):40.[doi:10.11731/j.issn.1673-193X.2015.04.006]
 AN Yong-lin,CAI Hai-bin,YUE Jian,et al.Analysis on influence of high-speed rail on main shaft of neighboring mine[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(6):40.[doi:10.11731/j.issn.1673-193X.2015.04.006]
[2]王羽扬,刘勇,王沉,等.高应力大变形软岩巷道“三壳”围岩控制机理及应用[J].中国安全生产科学技术,2019,15(7):100.[doi:10.11731/j.issn.1673-193x.2019.07.016]
 WANG Yuyang,LIU Yong,WANG Chen,et al.Control mechanism and application of “Triple shell” surrounding rock in high stress and large deformation soft rock roadway[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(6):100.[doi:10.11731/j.issn.1673-193x.2019.07.016]
[3]吴波,路明,雷领,等.基于正交试验、组合赋权-灰色关联度法研究隧道施工最优方案[J].中国安全生产科学技术,2019,15(8):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
 WU Bo,LU Ming,LEI ling,et al.Research on optimal scheme of tunnel construction based on orthogonal test and combined weightinggrey correlation method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(6):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
[4]崔光耀,田宇航,麻建飞,等.高烈度地震区隧道软硬围岩交接段刚柔并济抗减震技术研究*[J].中国安全生产科学技术,2021,17(4):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
 CUI Guangyao,TIAN Yuhang,MA Jianfei,et al.Research on rigid-flexible combination anti-seismic technology on soft-hard surrounding rock intersection of tunnel in high intensity seismic area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
[5]王兵.新建草莓沟2号隧道近接下穿既有隧道施工安全影响分析*[J].中国安全生产科学技术,2021,17(5):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
 WANG Bing.Analysis on construction safety influence of newly-built Caomeigou No.2 tunnel close undercrossing existing tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
[6]安栋,刘天旺,郭艳军.强震区跨断层隧道纤维混凝土衬砌抗震效果分析*[J].中国安全生产科学技术,2021,17(6):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
 AN Dong,LIU Tianwang,GUO Yanjun.Analysis on seismic effect of fiber concrete lining in cross-fault tunnel at strong earthquake area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
[7]崔光耀,石文昊,王明胜,等.高烈度地震区跨断层隧道不同厚度减震层减震效果分析*[J].中国安全生产科学技术,2021,17(7):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
 CUI Guangyao,SHI Wenhao,WANG Mingsheng,et al.Analysis on shock absorption effect of shock-absorbing layer with different thicknesses for fault-crossing tunnels in high seismic intensity zone[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
[8]于阳,孙雅珍,林志军,等.基坑开挖引起邻侧盾构隧道开裂特性研究*[J].中国安全生产科学技术,2021,17(10):99.[doi:10.11731/j.issn.1673-193x.2021.10.015]
 YU Yang,SUN Yazhen,LIN Zhijun,et al.Study on cracking characteristics of adjacent shield tunnel caused by foundation pit excavation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(6):99.[doi:10.11731/j.issn.1673-193x.2021.10.015]
[9]曹成威,石钰锋,詹涛,等.考虑动态施工超长管棚预支护力学特性及参数影响分析*[J].中国安全生产科学技术,2022,18(6):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
 CAO Chengwei,SHI Yufeng,ZHAN Tao,et al.Analysis on mechanical characteristics and parameter influence of pre-support for ultra-long pipe shed considering dynamic construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(6):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
[10]项琴,朱宏伟,杜义祥,等.隧道突泥涌水情景构建及演化状态预测模型*[J].中国安全生产科学技术,2022,18(8):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]
 XIANG Qin,ZHU Hongwei,DU Yixiang,et al.Scenario construction and evolution state prediction model of water and mud inrush in tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(6):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]
[11]崔光耀,祁家所,王明胜.中义隧道片理化玄武岩段大变形控制技术研究*[J].中国安全生产科学技术,2020,16(10):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]
 CUI Guangyao,QI Jiasuo,WANG Mingsheng.Study on large deformation control technology of schistositized basalt section in Zhongyi tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(6):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]

备注/Memo

备注/Memo:
收稿日期: 2022-12-29
* 基金项目: 国家自然科学基金项目(52178378)
作者简介: 崔光耀,博士,教授,主要研究方向为隧道与地下工程。
通信作者: 克旭,硕士研究生,主要研究方向为隧道与地下工程。
更新日期/Last Update: 2023-07-09