|本期目录/Table of Contents|

[1]裴俊豪,谭强,刘宁,等.梁锚结构加固浅埋隧道洞口软弱地层的承载特性研究*[J].中国安全生产科学技术,2023,19(1):95-102.[doi:10.11731/j.issn.1673-193x.2023.01.014]
 PEI Junhao,TAN Qiang,LIU Ning,et al.Study on bearing characteristics of weak stratum at portal of shallow-buried tunnel reinforced by beam-anchor structure[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(1):95-102.[doi:10.11731/j.issn.1673-193x.2023.01.014]
点击复制

梁锚结构加固浅埋隧道洞口软弱地层的承载特性研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
19
期数:
2023年1期
页码:
95-102
栏目:
职业安全卫生管理与技术
出版日期:
2023-01-31

文章信息/Info

Title:
Study on bearing characteristics of weak stratum at portal of shallow-buried tunnel reinforced by beam-anchor structure
文章编号:
1673-193X(2023)-01-0095-08
作者:
裴俊豪谭强刘宁黄义雄陈坤
(1.贵州大学 土木工程学院,贵州 贵阳 550025;
2.中交一公局集团第四工程有限公司,北京 100024)
Author(s):
PEI Junhao TAN Qiang LIU Ning HUANG Yixiong CHEN Kun
(1.College of Civil Engineering,Guizhou University,Guiyang Guizhou 550025,China;
2.The Fourth Engineering Co.,Ltd.of CCCC First Highway Engineering Co.,Ltd.,Beijing 100024,China)
关键词:
隧道洞口软弱地层混凝土框架梁扩大头锚杆沉降控制
Keywords:
tunnel portal weak stratum concrete frame beam bit expanded anchor rod settlement control
分类号:
X947
DOI:
10.11731/j.issn.1673-193x.2023.01.014
文献标志码:
A
摘要:
针对隧道洞口埋深浅且软弱围岩稳定性差这一问题,提出在地表增设混凝土框架梁,设置扩大头锚杆与框架梁连接并深入软弱围岩,运用数值模拟分析“混凝土框架梁-扩大头锚杆”结构加固软弱地层后的力学特性。研究结果表明:采用“混凝土框架梁-扩大头锚杆”加固隧道洞口软弱地层,k=0.4时,相比于没有加固对照模型,隧道最大拱顶沉降值下降68.7%,隧道最大边墙收敛值下降15.1%,初期支护最大等效应力减小12.7%;建立不同加固区围岩松动压力分散系数k下的数值模型,通过拱顶沉降结果与加固区围岩松动压力分散系数的线性拟合,提出采用加固结构后的隧道拱顶沉降规律与围岩松动压力计算方法。
Abstract:
Aiming at the problem of shallow buried depth and poor stability of weak surrounding rock at the tunnel portal,being different from the traditional grouting combined with advance support to reinforce the surrounding rock,it was proposed to add the concrete frame beam on the ground surface,set up the bit expanded anchor rods connecting with the frame beam,and go deep into the weak surrounding rock.The mechanical characteristics of weak stratum reinforced by the “concrete frame beam and bit expanded anchor rods” structure were analyzed by numerical simulation.The results showed that after applying the “concrete frame beam and bit expanded anchor rods” to reinforce the weak stratum at tunnel portal,when the dispersion coefficient of loosening pressure of surrounding rock in the reinforcement area was k=0.4,compared with the control model without reinforcement,the maximum vault settlement of the tunnel decreased by 68.7%,the maximum side wall convergence of the tunnel decreases by 15.1%,and the maximum equivalent stress of initial support decreased by 12.7%.The numerical model under different k values was established,and through the linear fitting between the vault settlement results and k,the tunnel vault settlement law and the calculation method of loosening pressure of surrounding rock after using the reinforcement structure were proposed.

参考文献/References:

[1]CHAO Y,ZHANG X H,DA H,et al.Failure mechanism of primary support for a shallow and asymmetrically loaded tunnel portal and treatment measures[J].Journal of Performance of Constructed Facilities,2020,34(1):11-17.
[2]卓越,李治国,高广义.隧道注浆技术的发展现状与展望[J].隧道建设,2021,41(11):1953-1963. ZHUO Yue,LI Zhiguo,GAO Guangyi.Development status and prospect of tunnel grouting technology[J].Tunnel Construction,2021,41(11):1953-1963.
[3]贾建波,姚晖,周志辉.改性脲醛树脂在高黎贡山隧道1号竖井注浆堵水中的应用[J].隧道建设,2021,12(9):1-6. JIA Jianbo,YAO Hui,ZHOU Zhihui.Application of modified urea formaldehyde resin in grouting method for water sealing of No.1 shaft of Gaoligongshan tunnel[J].Tunnel Construction,2021,12(9):1-6.
[4]刘永超,袁振宇,程雪松,等.不同注浆材料对隧道漏水漏砂封堵效果试验研究[J].岩土工程学报,2021,43(S2):249-252. LIU Yongchao,YUAN Zhenyu,CHENG Xuesong,et al.Experimental study on plugging effect of different grouting materials for water and sand leakage of tunnels[J].Chinese Journal of Geotechnical Engineering,2021,43(S2):249-252.
[5]余俊,翁贤杰,樊文胜,等.松散地层隧道进洞段管棚注浆加固效应分析[J].山东大学学报(工学版),2020,50(6):92-100. YU Jun,WENG Xianjie,FAN Wensheng,et al.Analysis of pipe roof grouting reinforcement effect at tunnel entrance in loose stratum[J].Journal of Shandong University(Engineering Science),2020,50(6):92-100.
[6]王立川,李志鹏,刘志强,等.富水昔格达组软弱易滑地层PBA进洞法实践[J].隧道建设,2019,39(1):139-147. WANG Lichuan,LI Zhipeng,LIU Zhiqiang,et al.Application of PBA method for tunnel portal excavation in soft and easy-sliding strata of water-rich Xigeda Formation[J].Tunnel Construction,2019,39(1):139-147.
[7]AYBERK K,KADIR K,FIKRI B.Geotechnical investigations and remediation design for failure of tunnel portal section:a case study in northern Turkey[J].Journal of Mountain Science,2017,14(6):1140-1160.
[8]ZHINAN H,JIN S,YUNFEI W,et al.Cracking characteristics and mechanism of entrance section in asymmetrically-load tunnel with bedded rock mass:acase study of a highway tunnel in southwest China[J].Engineering Failure Analysis,2021,122:105221.
[9]安亚雄,郑君长,张翾.软岩隧道塌方事故致灾因素耦合分析[J].中国安全生产科学技术,2021,17(1):122-128. AN Yaxiong,ZHENG Junchang,ZHANG Xuan.Coupling analysis on accident-causing factors of collapse accidents in soft rock tunnel[J].Journal of Safety Science and Technology,2021,17(1):122-128.
[10]赖金星,邱军领,牛方园,等.浅埋偏压黄土隧道塌方处治及效果分析[J].现代隧道技术,2017,54(2):194-201. LAI Jinxing,QIU Junling,NIU Fangyuan,et al.The effects of treatment of collapses in shallow-buried loess tunnels with unsymmetrical loading[J].Modern Tunneling Technology,2017,54(2):194-201.
[11]左清军,吴立,林存友,等.富水软岩隧道跨越断层段塌方机制分析及处治措施[J].岩石力学与工程学报,2016,35(2):369-377. ZUO Qingjun,WU Li,LIN Cunyou,et al.Collapse mechanismand treatment measures for tunnel in water-rich soft rockcrossing fault[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(2):369-377.
[12]王哲,王乔坎,马少俊,等.扩大头可回收预应力锚索极限抗拔力计算方法研究[J].岩土力学,2018,39(S2):202-208. WANG Zhe,WANG Qiaokan,MA Shaojun,et al.A method for calculating ultimate pullout force of recoverable under-reamed prestressed anchor cable[J].Rock and Soil Mechanics,2018,39(S2):202-208.
[13]彭立敏,施成华,刘小兵.隧道工程[M].长沙:中南大学出版社,2017.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2022-04-11
* 基金项目: 国家自然科学基金项目(52168056)
作者简介: 裴俊豪,硕士研究生,主要研究方向为隧道与地下工程。
通信作者: 刘宁,博士,副教授,主要研究方向为隧道与地下工程。
更新日期/Last Update: 2023-02-14