[1]迟愚,段德祥,王言峰,等.自升式悬臂梁钻井平台选型技术分析[J].石油机械,2011,39(10):136-140.
CHI Yu,DUAN Dexiang,WANG Yanfeng,et al.Technical analysis of the selection of jack-up cantilever drilling platform[J].China Petroleum Machinery,2011,39(10):136-140.
[2]任宪刚,白勇,贾鲁生.自升式钻井平台悬臂梁研究[J].船舶力学,2011,15(4):402-409.
REN Xiangang,BAI Yong,JIA Lusheng.Cantilever beam study of offshore jack-up drilling rig[J].Journal of Ship Mechanics,2011,15(4):402-409.
[3]赵军,段梦兰,宋林松,等.自升式钻井平台就位时老脚印对桩靴性能的影响分析[J].中国海上油气,2014,5(26):104-108.
ZHAO Jun,DUAN Menglan,SONG Linsong,et al.Effect of the footprint on the structure behavior of spud can during jackupemplacement[J].China Offshore Oil and Gas,2014,5(26):104-108.
[4]叶洪东,孙红月,要明伦.海洋移动式桩基钻井平台重复就位时滑移的计算与分析[J].中国海洋平台,1999,3(14):18-22.
YE Hongdong,SUN Hongyue,YAO Minglun.Analysis and calculation of sliding of jack up unit during re siting[J].CHINA OFFSHORE PLATFORM,1999,3(14):18-22.
[5]张浦阳,于晓洋,丁红岩.海上自升式钻井平台插桩阶段桩靴承载力计算[J].石油勘探与开发,2011,5(38):613-618.
ZHANG Puyang,YU Xiaoyang,DING Hongyan.Spudcan bearing capacity calculation of the offshore jack-up drilling platform during the preloading process [J].Petroleum Exploration and Development,2011,5(38):613-618.
[6]杨进,徐国贤,刘书杰,等.自升式钻井平台桩腿入泥深度计算研究[J].中国海上油气,2012,6(24):58-60.
YANG Jin,XU Guoxian,LIU Shujie,et al.Research on leg penetration depth calculation of jack-up drilling platform [J].China Offshore Oil and Gas,2012,6(24):58-60.
[7]潘亿勇,齐恒之.自升式悬臂钻井船重返井口就位方式浅析[J].中国海洋平台,2015,2(30):1-3.
PAN Yiyong,QI Hengzhi.Analysis on positioning in the jack-up reentry to the wellhead platform[J].China Offshore Platform,2015,2(30):1-3.
[8]和鹏飞,赵业新.全回转拖轮辅助自升式平台就位技术在复杂海底条件下的应用[J].探矿工程,2014,9(41):49-52.
HE Pengfei,ZHAO Yexin.Application of positioning technology of fully rotary tugboat assist jack-up drilling platform in complex submarine conditons[J].Exploration Engineering,2014,9(41):49-52.
[9]张朋,吴建政,王楠,等.埕岛海域移动式钻井平台桩基适宜性分析[J].海洋地质前沿,2012,9(28):54-60.
ZHANG Peng,WU Jianzheng,WANG Nan,et al.Suitability of pile foundation for mobile drilling platform in chengdao sea area[J].Marine Geology Frontiers,2012,9(28):54-60.
[10]刑延.自升式钻井船重返井口作业的地基问题[J].中国海上油气,1989,1(4):29-35.
XING Yan.Foundation problem in the jack-up reentry to the wellhead[J].China Offshore Oil and Gas,1989,1(4):29-35.
[11]胡南丁,杨进,杨国栋,等.海洋环境载荷对自升式平台就位的影响[J].石油工程建设,2019,45(1):13-17.
HU Nanding,YANG Jin,YANG Guodong,et al.Influence of marine environmental load on positioning of jack-up platform[J].Petroleum Engineering Construction,2019,45(1):13-17.
[12]彭巍,管申,张超,等.自升式钻井平台精就位技术实践[J].重庆科技学院学报(自然科学版),2018,20(2):17-19,23.
PENG Wei,GUAN Shen,ZHANG Chao,et al.Technology and practice of accurate positioning of jack-up rig[J].Journal of Chongqing University of Science and Technology(Natural Sciences Edition),2018,20(2):17-19,23.
[13]方长传.自升式钻井平台调整井作业精确就位技术研究与应用[J].中国海上油气,2013,25(4):42-45.
FANG Changchuan.Research and application of precise positioning technology of jackup platform for adjustment wells[J].China Offshore Oil And Gas,2013,25(4):42-45.
[14]张威,徐召,潘丕博.海洋自升式钻井平台精就位风险及控制[J].辽宁化工,2019,48(11):1108-1110.
ZHANG Wei,XU Zhao,PAN Pibo.Precision positioning risk and control of offshore jack-up drilling platform[J].Liaoning Chemical Industry,2019,48(11):1108-1110.
[15]王金明,李春,沈德新.基于数据库的钻井平台插桩就位预测系统设计与实现[J].海岸工程,2015,1(34):55-62.
WANG Jinming,LI Chun,SHEN Dexin.Design and implementation of drilling platform spud can position prediction system based on database[J].Coastal Engineering,2015,1(34):55-62.
[16]中国海洋石油集团有限公司钻完井专业标准化委员会.自升式钻井平台就位插桩压载作业要求:Q/HS 14033—2018[S].中国海洋石油集团有限公司,2018.
[1]张惠军.个体防护装备鞋靴的受限物质研究[J].中国安全生产科学技术,2013,9(5):89.[doi:10.11731/j.issn.1673-193x.2013.05.017]
ZHANG Hui jun.Research on the restricted substances in personal protective footwear[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(11):89.[doi:10.11731/j.issn.1673-193x.2013.05.017]
[2]李希平,刘波,陈存恩,等.刚性桩复合地基的理论、实测与安全性研究*[J].中国安全生产科学技术,2009,5(6):38.
LI Xi ping,LIU Bo,CHEN Cun en,et al.Research on the theory, experiment and safety of rigid pile composite foundations[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2009,5(11):38.
[3]石杰红,许巧祥,龚敏,等.高压燃气管道临近爆破施工安全性及方案研究[J].中国安全生产科学技术,2014,10(11):119.[doi:10.11731/j.issn.1673-193x.2014.11.020]
SHI Jie-hong,XU Qiao-xiang,GONG Min,et al.Study on safety and plan of blasting work near high pressure gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(11):119.[doi:10.11731/j.issn.1673-193x.2014.11.020]
[4]韩森,张钦礼,刘泽洲,等.近塌陷区矿山公路开采沉降规律及安全性研究[J].中国安全生产科学技术,2015,11(8):126.[doi:10.11731/j.issn.1673-193x.2015.08.021]
HAN Sen,ZHANG Qin-li,LIU Ze-zhou,et al.Settlement property and safety of mine road near subsidence area under mining disturbance[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(11):126.[doi:10.11731/j.issn.1673-193x.2015.08.021]
[5]王薇,邓俊,尹俊涛.空间裂缝病害下铁路隧道衬砌结构安全性研究[J].中国安全生产科学技术,2016,12(1):33.[doi:10.11731/j.issn.1673-193x.2016.01.006]
WANG Wei,DENG Jun,YIN Juntao.Research on safety of lining structure in railway tunnel under spatial crack disease[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(11):33.[doi:10.11731/j.issn.1673-193x.2016.01.006]
[6]马欣,薛涛,师统麾,等.影响凹陷管道安全因素分析[J].中国安全生产科学技术,2016,12(6):123.[doi:10.11731/j.issn.1673-193x.2016.06.022]
MA Xin,XUE Tao,SHI Tonghui,et al.Analysis on influence factors of dent pipeline safety[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(11):123.[doi:10.11731/j.issn.1673-193x.2016.06.022]
[7]高飞,邓存宝,王雪峰,等.烟气注入采空区封存的可行性与安全性分析[J].中国安全生产科学技术,2016,12(7):60.[doi:10.11731/j.issn.1673-193x.2016.07.011]
GAO Fei,DENG Cunbao,WANG Xuefeng,et al.Analysis on feasibility and safety in sealing of smoke injected into goaf[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(11):60.[doi:10.11731/j.issn.1673-193x.2016.07.011]
[8]王薇,邹江海,潘文硕,等.不同施工顺序对陡坡偏压小净距隧道围岩稳定性的影响研究[J].中国安全生产科学技术,2016,12(8):28.[doi:10.11731/j.issn.1673-193x.2016.08.005]
WANG Wei,ZOU Jianghai,PAN Wenshuo,et al.Study on influence to stability of surrounding rock by different construction
sequence for bias tunnel with small interval and steep slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(11):28.[doi:10.11731/j.issn.1673-193x.2016.08.005]
[9]徐平,沈佳兴,于英华,等.泡沫铝填充结构救生舱多目标优化设计[J].中国安全生产科学技术,2017,13(3):156.[doi:10.11731/j.issn.1673-193x.2017.03.025]
XU Ping,SHEN Jiaxing,YU Yinghua,et al.Multi-objective optimization design of rescue cabin filled with foam aluminum[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(11):156.[doi:10.11731/j.issn.1673-193x.2017.03.025]
[10]石杰红.地铁通道下穿燃气管道安全性Peck公式修正计算及数值分析[J].中国安全生产科学技术,2018,14(6):182.[doi:10.11731/j.issn.1673-193x.2018.06.029]
SHI Jiehong.Revised calculation and numerical analysis on Peck formula for safety of metro passage with underneath crossing gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(11):182.[doi:10.11731/j.issn.1673-193x.2018.06.029]