|本期目录/Table of Contents|

[1]周云健,李清平,刘书杰.考虑气液置换的压回法气井压井过程对井底压力的影响*[J].中国安全生产科学技术,2021,17(3):103-109.[doi:10.11731/j.issn.1673-193x.2021.03.016]
 ZHOU Yunjian,LI Qingping,LIU Shujie.Influence on bottom hole pressure during killing process of gas wells using bullheading method considering gas-liquid replacement[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(3):103-109.[doi:10.11731/j.issn.1673-193x.2021.03.016]
点击复制

考虑气液置换的压回法气井压井过程对井底压力的影响*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
17
期数:
2021年3期
页码:
103-109
栏目:
职业安全卫生管理与技术
出版日期:
2021-03-31

文章信息/Info

Title:
Influence on bottom hole pressure during killing process of gas wells using bullheading method considering gas-liquid replacement
文章编号:
1673-193X(2021)-03-0103-07
作者:
周云健李清平刘书杰
(中海油研究总院有限责任公司,北京 100028)
Author(s):
ZHOU Yunjian LI Qingping LIU Shujie
(CNOOC Research Institute,Beijing 100028,China)
关键词:
压回法压井气液置换流动规律井底压力变化
Keywords:
bullheading method for well killing gas-liquid replacement flow law change of bottom hole pressure
分类号:
X937
DOI:
10.11731/j.issn.1673-193x.2021.03.016
文献标志码:
A
摘要:
为在压回法气井压井计算中进一步贴合现场实际情况,提出新的压回法气井压井过程计算方法。在压井过程中,考虑压井液与侵入井筒的气体发生置换,导致井筒流体自上而下分布为液-气液2相-气-气液2相的实际问题,建立压井过程模型,并对井底压力的变化进行计算分析。结果表明:发生气液置换对压回法压井过程井底压力以及注入压力具有明显影响,考虑气液置换对井底压力的控制可更加精确,同时,气液置换越多,压回过程所需要的注入压力越大,易引起更加严重事故。因此,气液置换过程在压回法压井过程不可忽略。
Abstract:
In order to be more in line with the field actual conditions during the killing calculation of gas wells by using the bullheading method, a new method for calculating the killing process of gas wells by using the bullheading method was proposed. During killing, the gas-liquid replacement process between the gas from the reservoir and the kill fluid was taken into account, which made the wellbore fluid distribution from top to bottom was liquid, gas-liquid two phase, gas and gas-liquid two phase. A model of killing process was established correspondingly. The results show that the gas-liquid replacement had significant influence on the bottom hole pressure and injection pressure during the killing process by using the bullheading method, which made the bottom hole pressure be controlled more accurately. At the same time, the more the gas-liquid replacement, the greater the injection pressure required for the bullheading process, which may lead to the greater accident. Therefore, the gas-liquid replacement process cannot be ignored in the well killing process by using the bullheading method.

参考文献/References:

[1]Al-MUHAILAN M,Al-SHLEH A,Al-SHAYJI A K,et al.Directional challenges and planning of relief well to resolve an HP/HT well blowout [C]//The IADC/SPE Drilling Conference and Exhibition.Fort Worth:Society of Petroleum Engineers,2014:4-6.
[2]OLBERG T,GILHUUS T,LERAAND F,et al.Re-entry and relief well drilling to kill an underground blowout in a subsea well:a case history of well 2/4-14 [C]//The SPE/IADC Drilling Conference.Amsterdam:Society of Petroleum Engineers,1991:11-14.
[3]SANTOS O L A.A study on blowouts in ultra deep waters [C]// The SPE Latin American and Caribbean Petroleum Engineering Conference.Buenos Aires:Society of Petroleum Engineers,2001:25-28.
[4]SKALLE P,JINJUN H,PODIO A L.Killing methods and consequences of 1120 gulf coast blowouts during 1960-1996 [C]// The Latin American and Caribbean Petroleum Engineering Conference.Caracas:Society of Petroleum Engineers,1999:21-23.
[5]GRACE R D,CUDD B,CHEN J S.The blowout at CHK-140W[C]//The IADC/SPE Drilling Conference.New Orleans:Society of Petroleum Engineers,2000:23-25.
[6]GARNER J B,FLORES W S,SCARBOROUGH C.Deepwater blowout-a case history:shallow gas hazards hide in the weeds [C]// The SPE/IADC Drilling Conference.Amsterdam:Society of Petroleum Engineers,2007:20-22.
[7]OUDEMAN P,TER AVEST D,GRODAL E O,et al.Bull heading to kill live gas wells [C]// The European Petroleum Conference.London:Society of Petroleum Engineers,1994:10-25.
[8]管志川,陈庭根.钻井工程理论与技术[M].东营:石油大学出版社,2000.
[9]KAMATH J,LAROCHE C.Laboratory-based evaluation of gas well deliverability loss caused by water blocking [J].SPE Journal,2003,8(1):71-80.
[10]张建光,李湘萍,王传睿,等.页岩气藏水力压裂中应力-流压耦合效应及人工裂缝扩展规律[J].中国石油大学学报(自然科学版),2018,42(6):96-105. ZHANG Jianguang,LI Xiangping,WANG Chuanrui,et al.Coupling effect of stress-flow pressure and artificial crack propagation in shale gas reservoir hydraulic fracturing [J].Journal of China University of Petroleum (Edition of Natural Science),2018,42(6):96-105.
[11]PARRIA G.Pressure analysis during bull heading operations in a deep-water environment using a fluid modeling simulator and sensitivity analysis [M].Lafayette,Louisiana:ProQuest Dissertations Publishing,2016.
[12]KHALID M A,NOUI-MEHIDIM N.A numerical analysis for acid bullheading treatment in oil and gas wells using Lattice Boltzmann method [C]//The SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition.Dammam:Society of Petroleum Engineers,2018:23-26.
[13]OBINNA U,KAPIL T,BASEL S,et al.Dynamic simulation to predict self-restart potential of acid stimulated wells by bullhead treatment in deepwater environment [C]//The SPE Annual Technical Conference and Exhibition.Houston:Society of Petroleum Engineers,2001:28-30.
[14]李勇政,袁骐骥,方军,等.挤压法压井计算与应用[J].石油钻探技术,2010,38(4):63-66. LI Yongzheng,YUAN Qiji,FANG Jun,et al.Calculation and application of bullheading [J].Petroleum Drilling Techniques,2010,38(4):63-66.
[15]刘凯.天然气井空井压井拟瞬态设计理论—第一次井底压力等于地层压力[J].天然气工业,1989(4):23-28. LIU Kai.The pseudo-transient design theory of empty well killing of natural gas wells:the first time the bottom hole pressure is equal to the formation pressure [J].Natural Gas Industry,1989(4):23-28.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2021-01-08
* 基金项目: 中国博士后科学基金项目(2020M680835);国家重点研发计划项目(2018YFC0310205)
作者简介: 周云健,博士,工程师,主要研究方向为水合物开采。