[1]Al-MUHAILAN M,Al-SHLEH A,Al-SHAYJI A K,et al.Directional challenges and planning of relief well to resolve an HP/HT well blowout [C]//The IADC/SPE Drilling Conference and Exhibition.Fort Worth:Society of Petroleum Engineers,2014:4-6.
[2]OLBERG T,GILHUUS T,LERAAND F,et al.Re-entry and relief well drilling to kill an underground blowout in a subsea well:a case history of well 2/4-14 [C]//The SPE/IADC Drilling Conference.Amsterdam:Society of Petroleum Engineers,1991:11-14.
[3]SANTOS O L A.A study on blowouts in ultra deep waters [C]// The SPE Latin American and Caribbean Petroleum Engineering Conference.Buenos Aires:Society of Petroleum Engineers,2001:25-28.
[4]SKALLE P,JINJUN H,PODIO A L.Killing methods and consequences of 1120 gulf coast blowouts during 1960-1996 [C]// The Latin American and Caribbean Petroleum Engineering Conference.Caracas:Society of Petroleum Engineers,1999:21-23.
[5]GRACE R D,CUDD B,CHEN J S.The blowout at CHK-140W[C]//The IADC/SPE Drilling Conference.New Orleans:Society of Petroleum Engineers,2000:23-25.
[6]GARNER J B,FLORES W S,SCARBOROUGH C.Deepwater blowout-a case history:shallow gas hazards hide in the weeds [C]// The SPE/IADC Drilling Conference.Amsterdam:Society of Petroleum Engineers,2007:20-22.
[7]OUDEMAN P,TER AVEST D,GRODAL E O,et al.Bull heading to kill live gas wells [C]// The European Petroleum Conference.London:Society of Petroleum Engineers,1994:10-25.
[8]管志川,陈庭根.钻井工程理论与技术[M].东营:石油大学出版社,2000.
[9]KAMATH J,LAROCHE C.Laboratory-based evaluation of gas well deliverability loss caused by water blocking [J].SPE Journal,2003,8(1):71-80.
[10]张建光,李湘萍,王传睿,等.页岩气藏水力压裂中应力-流压耦合效应及人工裂缝扩展规律[J].中国石油大学学报(自然科学版),2018,42(6):96-105.
ZHANG Jianguang,LI Xiangping,WANG Chuanrui,et al.Coupling effect of stress-flow pressure and artificial crack propagation in shale gas reservoir hydraulic fracturing [J].Journal of China University of Petroleum (Edition of Natural Science),2018,42(6):96-105.
[11]PARRIA G.Pressure analysis during bull heading operations in a deep-water environment using a fluid modeling simulator and sensitivity analysis [M].Lafayette,Louisiana:ProQuest Dissertations Publishing,2016.
[12]KHALID M A,NOUI-MEHIDIM N.A numerical analysis for acid bullheading treatment in oil and gas wells using Lattice Boltzmann method [C]//The SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition.Dammam:Society of Petroleum Engineers,2018:23-26.
[13]OBINNA U,KAPIL T,BASEL S,et al.Dynamic simulation to predict self-restart potential of acid stimulated wells by bullhead treatment in deepwater environment [C]//The SPE Annual Technical Conference and Exhibition.Houston:Society of Petroleum Engineers,2001:28-30.
[14]李勇政,袁骐骥,方军,等.挤压法压井计算与应用[J].石油钻探技术,2010,38(4):63-66.
LI Yongzheng,YUAN Qiji,FANG Jun,et al.Calculation and application of bullheading [J].Petroleum Drilling Techniques,2010,38(4):63-66.
[15]刘凯.天然气井空井压井拟瞬态设计理论—第一次井底压力等于地层压力[J].天然气工业,1989(4):23-28.
LIU Kai.The pseudo-transient design theory of empty well killing of natural gas wells:the first time the bottom hole pressure is equal to the formation pressure [J].Natural Gas Industry,1989(4):23-28.