[1]高玉昕,王国庆,朱建明,等.维修时间不确定性下配电网灾后维修队安排的鲁棒恢复研究*[J].中国安全生产科学技术,2020,16(12):44-49.[doi:10.11731/j.issn.1673-193x.2020.12.007]
 GAO Yuxin,WANG Guoqing,ZHU Jianming,et al.Research on robust recovery of postdisaster maintenance team arrangement for power distribution network under uncertainty of emergency repair time[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(12):44-49.[doi:10.11731/j.issn.1673-193x.2020.12.007]
点击复制

维修时间不确定性下配电网灾后维修队安排的鲁棒恢复研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年12期
页码:
44-49
栏目:
学术论著
出版日期:
2020-12-31

文章信息/Info

Title:
Research on robust recovery of postdisaster maintenance team arrangement for power distribution network under uncertainty of emergency repair time
文章编号:
1673-193X(2020)-12-0044-06
作者:
高玉昕王国庆朱建明黄钧
(中国科学院大学 工程科学学院,北京 100190)
Author(s):
GAO Yuxin WANG Guoqing ZHU Jianming HUANG Jun
(School of Engineering Science,University of Chinese Academy of Science,Beijing 100190,China)
关键词:
配电网修复脆弱性分析鲁棒优化维修人员派遣
Keywords:
Key words:repair of power distribution network vulnerability analysis robust optimization model maintenance personnel dispatch
分类号:
X934
DOI:
10.11731/j.issn.1673-193x.2020.12.007
文献标志码:
A
摘要:
为最小化灾后配电网损失量,准确描述完整维修队工作时间(分为路途时间与具体维修时间),依据台风路径对维修队所需路途时间进行分类,并利用期望概率描述具体维修时间的不确定性。建立2阶段分布式鲁棒优化模型,采用CCG算法分析国内某地区配电网算例发现:考虑维修时间不确定性可以有效减少配电网损失量。
Abstract:
In order to accurately describe the maintenance time,so as to minimize the loss of power distribution network after a disaster,the complete working time of the maintenance team (subdivided into travel time and specific maintenance time) was described.According to the typhoon path,the travel time of maintenance team was classified,and the expected probability was used to describe the uncertainty of the specific maintenance time,then a twostage distributed robust optimization model was established.The CCG algorithm was used to analyze the results of a domestic regional power distribution network example.The results showed that considering the uncertainty of maintenance time could effectively reduce the loss of power distribution network.

参考文献/References:

[1]朱建明.损毁情景下应急设施选址的多目标决策方法[J].系统工程理论与实践,2015,35(3):720-727. ZHU Jianming.Multi-objective decision making method for emergency facility location in damage scenario[J].System Engineering Theory and Practice,2015,35(3):720-727.
[2]FRANCIS R,BEKERAB.A metric and frameworks for resilience analysis of engineered and infrastructure systems[J].Reliability Engineering and System Safety,2014,121(1):90-103.
[3]吴向东,张国威.冰雪灾害对电网的影响及防范措施[J].中国电力,2018,41(12):14-18. WU Xiangdong,ZHANG Guowei.Impact of snow and ice disasters on power grid and preventive measures [J].China Power,2018,41(12):14-18.
[4]GUIKEMA S D,NATEGHI R,QUIRING S M,et al.Predicting hurricane power outages to support storm response planning[J].Access,2014(2):1364-1373.
[5]SHIBA K,AIDA J,KONDO K,et al.Mediation of the relationship between home loss and worsened cardiometabolic profiles of older disaster survivors by post-disaster relocation:a natural experiment from the Great East Japan earthquake and tsunami[J].Health and Place,2020(66):21-31.
[6]林冠强,莫天文,叶晓君,等.基于TOPSIS和CRITIC法的电网关键节点识别[J].高电压技术,2018,44(10):3383-3389. LIN Guanqiang,MO Tianwen,YE Xiaojun,et al.Key node identification of power grid based on TOPSIS and CIRITIC method[J].High Voltage Technology,2018,44(10):3383-3389.
[7]SALMAN A M,LI Y,STEWART M G.Evaluating system reliability and targeted hardening strategies of power distribution systems subjected to hurricanes[J].Reliability Engineering and System Safety,2015,144(12):319-333.
[8]肖智文,王国庆,朱建明,等.面向突发事件的电网韧性能力评价及构建方法[J].系统工程理论与实践,2019,39(10):2637-2645. XIAO Zhiwen,WANG Guoqing,ZHU Jianming,et al.Assessment and construction method of resilience capacity of power grid facing emergency [J].System Engineering Theory and Practice,2019,39(10):2637-2645.
[9]GHOLAMI A,AMINIFAR F,SHAHIDEHPOUR M.Front lines against the darkness:Enhancing the resilience of the electricity grid through microgrid facilities[J].Electrification Magazine,2016,4(1):18-24.
[10]ARIF A,WANG Z,WANG J,et al.Power distribution system outage management with co-optimization of repairs,reconfiguration,and DG dispatch[J].Transactions on Smart Grid,2017,9(5):4109-4118.
[11]CHEN C,WANG J,QIU F,et al.Resilient distribution system by microgrids formation after natural disasters[J].Transactions on smart grid,2015,7(2):958-966.
[12]LEI S,CHEN C,LI Y,et al.Resilient disaster recovery logistics of distribution systems:Co-optimize service restoration with repair crew and mobile power source dispatch[J].Transactions on Smart Grid,2019,10(6):6187-6202.
[13]FANG Y P,SANSAVINI G.Optimum post-disruption restoration under uncertainty for enhancing critical infrastructure resilience[J].Reliability Engineering and System Safety,2019,185.
[14]黄弦超,杨雨,范闻博.配电网多故障抢修与供电恢复联合优化模型[J].电力系统自动化,2014,38(11):68-73. HUANG Xianchao,YANG Yu,FAN Wenbo.Joint optimization model for multi-fault repair and power supply recovery of distribution network[J].Power system automation,2014,38(11):68-73.
[15]YUAN W,WANG J,QIU F,et al.Robust optimization-based resilient distribution network planning against natural disasters[J].Transactions on Smart Grid,2016,7(6):2817-2826.
[16]HOSSEIN S,BARKER K,RAMIREZ-MARQUEZ J E.A review of definitions and measures of system resilience[J].Reliability Engineering and System Safety,2016(145):47-61.
[17]XU Y,WANG Y,HE J,et al.Resilience-oriented distribution system restoration considering mobile emergency resource dispatch in transportation system[J].Journal of Engineering,2019,264.
[18]XIONG P,JIRUTITIJARONE P,SINGH C.A distributionally robust optimization model for unit commitment considering uncertain wind power generation[J].Transactions on Power Systems,2016,32(1):39-49.
[19]GHOSH P,EISELE S,DUBEY A,et al.Designing a decentralized fault-tolerant software framework for smart grids and its applications[J].Journal of Systems Architecture,2020(109):54-57.
[20]ARAB A,KHODAEI A,KHATOR S K,et al.Stochastic pre-hurricane restoration planning for electric power systems infrastructure[J].Transactions on Smart Grid,2015,6(2):1046-1054.
[21]CHEN B,YE Z,CHEN C,et al.Toward a synthetic model for distribution system restoration and crew dispatch[J].Transactions on Power Systems,2018,34(3):2228-2239.

相似文献/References:

[1]赵秀雯,柴建设.城市埋地天然气管道系统脆弱性评估指标研究[J].中国安全生产科学技术,2011,7(7):92.
 ZHAO- XiuwenCHAI- Jianshe,Prof..The indicators of vulnerability assessment about city buried gas pipeline system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):92.

备注/Memo

备注/Memo:
收稿日期: 2020-11-26
* 基金项目: 国家自然科学基金项目(72074202)
作者简介: 高玉昕,硕士研究生,主要研究方向为应急管理。
通信作者: 王国庆,博士,副教授,主要研究方向为应急管理、风险管理。
更新日期/Last Update: 2021-01-08