[1]许立甲,李杰,朱海鹰,等.石油石化行业危害与事故监测预警技术探讨[J].中国安全生产科学技术,2008,4(2):78-81.
XU Lijia,LI Jie,ZHU Haiying,et al.Discussion of monitoring and early-waring technology for hazards and accidents in Petroleum and petrochemical industries[J].Journal of Safety Science and Technology,2008,4(2):78-81.
[2]MANSOUR H,AHMAD M M,DHAFR N,et al.Evaluation of operational performance of workover rigs activities in oilfields[J].International Journal of Productivity & Performance Management,2013,62(2):204-218.
[3]任国友.油田在役石油井架安全检测及评价技术[J].中国安全生产科学技术,2009,5(3):144-148.
REN Guoyou.Safety testing and evaluation technology of in service oil rig derrick in oilfield.[J].Journal of Safety Science and Technology,2009,5(3):144-148.
[4]冯定,杨成,王鹏,等.海洋钻修机模块划分研究[J].石油机械,2011,39(5):75-78.
FENG Ding,YANG Cheng,WANG Peng,et al.Study on module division of offshore drilling platform [J].China Petroleum Machinery,2011,39(5):75-78.
[5]FENG D,LIAO Z J,WANG P,et al.The experimental study on the performance of anchor material of mooring system for deepwater drilling[J].Advanced Materials Research,2012,1569:65-69.
[6]段庆全,周性坤,张宏,等.XJ850修井机井架地震响应分析[J].石油机械,2016,44(7):46-50.
DUAN Qingquan,ZHOU Xingkun,ZHANG Hong,et al.Seismic response analysis of the XJ850 workover derrick [J].China Petroleum Machinery,2016,44(7):46-50.
[7]杨晓红,张邦成,陈兆峰.油田修井机井架的力学分析与优化设计[J].石油勘探与开发,2007(4):488-492.
YANG Xiaohong,ZHANG Bangcheng,CHEN Zhaofeng.Mechanical analysis and optimization design of oilfield workover derricks[J].Petroleum Exploration and Development,2007(4):488-492.
[8]鲍泽富,张宏科,李郁,等.XJJ60斜井修井机井架静力强度分析[J].石油机械,2010,38(10):43-45,48.
BAO Zefu,ZHANG Hongke,LI Yu,et al.Static strength analysis of XJJ60 inclined well workover rig[J].China Petroleum Machinery,2010,38(10):43-45,48.
[9]KHASAEV R M,KYAZIMOVA N I.Method of non-destructive derricks testing in field conditions:SU1716075(A1)[P].1992-02-28.
[10]ANSYS Inc.ANSYS Elements Reference 11th [M].North Carolina:SAS.IP Inc,2001.
[11]SAWARYN S J,The stability of a pipe stand racked in a derrick Part 1-Foundation [C]//SPE/IADC Drilling Conference and Exhibition,2013.
[12]ALOISE D J,ALOISE D,ROCHA C T M,et al.Scheduling workover rigs for onshore oil production[J].Discrete Applied Mathematics,2004,154(4):695-702.
[13]FU H D,YANG W,WANG S G.Finite element analysis and optimal design for the derrick of workover rig[J].Advanced Materials Research,2013,631-632:900-904.
[14]AISC Committee.Allowable Stress Design:ANSI/AISC 360-05 [S].9th.Chicago:AISC,2005.
[15]张强,刘巨保,姚利明,等.石油钻机井架结构梁单元计算精度分析[J].石油机械,2013,41(12):1-5.
ZHANG Qiang,LIU Jubao,YAO Liming,et al.Calculation precision analysis of the beam element for rig derrick structural design[J].China Petroleum Machinery,2013,41(12):1-5.
[16]API.Specification for drilling and well servicing structures:API Spec 4F[S].Washington:API,2013.