[1]伍永平, 贠东风. 大倾角综采支架稳定性控制[J]. 矿山压力与顶板管理, 1999, 16(S1):82-85.
WU Yongping, YUN Dongfeng. The stability control of support at top caving face with steep seam [J].Ground Pressure and Strata Control, 1999, 16(S1): 82-85.
[2]尹光志, 鲜学福, 代高飞, 等. 大倾角煤层开采岩移基本规律的研究[J]. 岩土工程学报, 2001,23(4):450-453.
YIN Guangzhi, XIAN Xuefu, DAI Gaofei, et al. Basic behaviour of strata movement in seam with deep dip angle [J]. Chinese Journal of Geotechnical Engineering, 2001, 23(4): 450-453.
[3]石平五.西部煤矿岩层控制泛述[J]. 矿山压力与顶板管理, 2002, 19(1):6-8.
SHI Pingwu. Discussion of coal mine strata controlling in Western Area [J]. Grount Pressure and Starat Control, 2002, 19(1): 6-8.
[4]高明中, 余忠林. 厚冲积层急倾斜煤层群开采重复采动下的开采沉陷[J]. 煤炭学报, 2007, 32(4):347-352.
GAO Mingzhong, YU Zhonglin. Repetitive mining subsidence with thick soil layers and steep seam [J]. Journal of China Coal Society, 2007, 32(4): 347-352.
[5]丁德民, 马凤山, 张亚民, 等. 急倾斜矿体分步充填开采对地表沉陷的影响[J]. 采矿与安全工程学报, 2010, 27(2):249-254.
DING Demin, MA Fengshan, ZHANG Yamin, et al. Effect of multi-step back filling of steep orebody on ground surface subsidence [J]. Journal of Mining & Safety Engineering, 2010, 27(2): 249-254.
[6]KULAKOV V N. Stress state in the face region of a steep coal bed [J]. Jounal of Mining Science (English Translation), 1995(9): 161~168.
[7]BODI J. Safety and technological aspects of manless exploitation technology for steep coal seams [C]// 27th international conference of safety in mines research institutes, 1997:955-965.
[8]周波, 袁亮, 薛生, 等. 断层带破碎煤巷围岩锚注预强化技术[J].采矿与安全工程学报, 2018, 35(3):509-516.
ZHOU Bo, YUAN Liang, XUE Sheng, et al. Pre-strengthening technology of bolt-grouting in broken coal roadway in fault zone [J]. Journal of Mining & Safety Engineering, 2018, 35(3): 509-516.
[9]周波, 袁亮, 薛俊华, 等.巷道顶板三维板梁结构的传力机制研究[J]. 中国安全生产科学技术, 2017, 13(12):131-137.
ZHOU Bo,YUAN Liang,XUE Junhua,et al. Study on force transfer mechanism of roadway roof with three-dimensional plate girder structure[J]. Journal of Safety Science and Technology, 2017, 13(12): 131-137.
[10]周波, 袁亮, 薛生. 煤巷顶板围岩结构承载能力弱化分析[J]. 中国安全生产科学技术, 2018, 14(9):122-128.
ZHOU Bo, YUAN Liang, XUE Sheng. Analysis on bearing capacity weakening of surrounding rock structure at roof of coal roadway [J]. Journal of Safety Science and Technology, 2018, 14(9): 122-128.
[11]王金安, 张基伟, 高小明, 等. 大倾角厚煤层长壁综放开采基本顶破断模式及演化过程(Ⅰ)—初次破断[J].煤炭学报, 2015, 40(6):1353-1360.
WANG Jinan, ZHANG Jiwei, GAO Xiaoming, et al. Fracture mode and evolution of main roof stratum above long wall fully mechanized top coal caving in steeply inclined thick coal seam(Ⅰ)—initial fracture [J]. Journal of China Coal Society, 2015, 40(6): 1353-1360.
[12]施峰, 王宏图, 范晓刚, 等. 俯伪斜采煤法基本顶破断的力学分析[J]. 煤炭学报, 2013, 38(6):1001-1005.
SHI Feng, WANG Hongtu, FAN Xiaogang, et al. Mechanical analysis of main roof breakage with dip oblique coal mining method [J]. Journal of China Coal Society, 2013, 38(6): 1001-1005.
[13]王红伟. 大倾角煤层长壁开采围岩应力演化及结构稳定性研究[D]. 西安:西安科技大学, 2014.
[14]高会春, 海龙, 崔铁军. 开采过程中上覆急倾斜岩层运移规律模拟与研究[J]. 煤炭学报, 2015, 40(10):2380-2385.
GAO Huichun, HAI Long, CUI Tiejun. Study and simulation of overburden strata migration law of steep inclined strata in mining process [J]. Journal of China Coal Society, 2015, 40(10): 2380-2385.
[15]张宏伟, 朱峰, 盛继权, 等. 多手段综合分析特厚煤层分层开采覆岩破坏高度[J]. 中国安全生产科学技术, 2016, 12(1):11-16.
ZHANG Hongwei, ZHU Feng, SHENG Jiquan, et al. Multiple means comprehensive analysis on failure height of overburden strata in slicing mining of ultra thick coal seam [J]. Journal of Safety Science and Technology, 2016, 12(1): 11-16.
[16]张勋, 邓存宝, 王继仁, 等. 纵深大区域煤层群开采覆岩活动规律相似模拟[J]. 中国安全生产科学技术, 2015, 11(6):5-11.
ZHANG Xun, DENG Cunbao, WANG Jiren, et al. Physical analogous simulation on activity law of overlying strata for the depth and large area coal seam group mining [J]. Journal of Safety Science and Technology, 2015, 11(6): 5-11.