[1]徐剑坤,朱亚飞,宋大钊,等.基于剪切梁理论的爆破扰动对巷道顶板稳定性影响研究[J].中国安全生产科学技术,2013,9(7):25-31.
XU Jiankun,ZHU Yafei,SONG Dazhao,et al. Study on roadway roof stability disturbed by blasting based on shear beam theory[J]. Journal of Safety Science and Technology,2013,9(7):25-31.
[2]隋斌,朱维申,李树忱. 深部岩柱在动态扰动下力学响应的数值模拟[J]. 岩土力学,2009,30(8):2501-2505.
SUI Bin,ZHU Weishen,LI Shuchen. Simulation of mechanical response of deep rock pillar triggered by dynamic disturbance[J]. Rock and Soil Mechanics,2009,30(8):2501-2505.
[3]左宇军,唐春安,朱万成,等.深部岩巷在动力扰动下的破坏机理分析[J].煤炭学报,2006,31(6):742-746.
ZUO Yujun,TANG Chunan,ZHU Wancheng,et al. Mechanism analysis on failure of deep rock laneway under dynamic disturbance[J]. Journal of China Coal Society,2006,31(6):742-746.
[4]周子龙,李国楠,宁树理,等. 侧向扰动下高应力岩石的声发射特性与破坏机制[J]. 岩石力学与工程学报,2014,34(8):1720-1728.
ZHOU Zilong,LI Guonan,NING Shuli,et al. Acoustic emission characteristics and failure mechanism of high-strssed rocks under lateral disturbance [J]. Chinese Journal of Rock Mechanics and Engineering,2014,34(8):1720-1728.
[5]魏明尧,王恩元,刘晓斐,等. 动力扰动诱发顶板断裂的数值模拟分析[J].采矿与安全工程学报,2010,27(4) :533-536.
WEI Mingyao,WANG Enyuan,LIU Xiaofei,et al. Numerical Simulation of Roof Fracture Induced by Dynamic Disturbance[J]. Journal of Mining & Safety Engineering,2010,27(4) :533-536.
[6]唐礼忠,高龙华,王春,等. 动力扰动下含软弱夹层巷道围岩力学响应特性[J].科技导报,2014,32(21):56-61.
TANG Lizhong,GAO Longhua,WANG Chun,et al. Mechanical response features of roadway surrounding rock with weak interlayer under dynamic disturbance[J]. Science and Technology Review,2014,32(21):56-61.
[7]李夕兵,李地元,郭雷,等. 动力扰动下深部高应力矿柱力学响应研究[J].岩石力学与工程学报 2007,26(5):922-928.
LI Xibing,LI Diyuan,GUO Lei. Study on mechanical response of highly-stressed pillars in deep mining under dynamic disturbance [J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(5):922-928.
[8]Zhu W C,Tang C A. Numerical simulation of Brazilian disk rock failure under static and dynamic loading[J]. International Journal Rock Mechanics and Mining Sciences, 2006, 43(2):236-252.
[9]李夕兵,廖九波,赵国彦,等. 动力扰动下高应力巷道围岩动态响应规律[J].科技导报,2012,30(22):48-54.
LI Xibing,LIAO Jiubo,ZHAO Guoyan,et al. Dynamic response of surrounding rock in highly-stressed tunnel under dynamic disturbance [J]. Science and Technology Review,2012,30(22):48-54.
[10]温颖远,牟宗龙,易恩兵,等.动力扰动下不同硬度煤层巷道围岩响应特征研究[J].采矿与安全工程学报,2013,30(4):555-559.
WEN Yingyuan,MU Zonglong,YI Enbing,et al. The response features of roadway surrounding rock in different hardness coal seams under dynamic disturbance [J]. Journal of Mining & Safety Engineering, 2013,30(4):555-559.
[11]唐礼忠,周建雄,张君,等. 动力扰动下深部采空区围岩力学响应及充填作用效果[J].成都理工大学学报(自然科学版),2012,39(6):623-628.
TANG Lizhong,ZHOU Jianxiong,ZHANG Jun ,et al. Mechanical response of deep stoped-out areas and filling effect under dynamic disturbance[J]. Journal of Chengdu University of Technology(Science & Technology Edition) ,2012,39(6):623-628.
[12]张玉成,杨光华,刘鹏,等.爆破荷载在数值计算中的等效施加方法研究[J]. 地下空间与工程学报,2012,8(1):56-64.
ZHANG Yucheng,YANG Guanghua,LIU Peng,et al. An equivalent approach for acting blasting load in dynamic numerical simulation of blasting vibration[J]. Chinese Journal of Underground Space and Engineering, 2012,8(1):56-64.
[13]林国洪.基于ANSYS和GeoStudio耦合的充填体底板稳定性分级[J]. 有色金属科学与工程,2014(3):91-95.
LIN Guohong.Stability classification of filling body’s base plate based on ANSYS and GeoStudio coupling[J]. Nonferrous Metals Science and Engineering, 2014(3):91-95.
[14]胡建华,雷涛,周科平,等.充填环境下预裂缝的爆破动力响应分析[J]. 中南大学学报(自然科学版), 2011(6):1704-1709.
HU Jianhua,LEI Tao,ZHOU Keping,et al. Effect of blasting vibration on pre-splitting crack in filling-environment[J]. Journal of Central South University, 2011(6):1704-1709.
[15]曹安业.采动煤岩冲击破裂的震动效应及其应用研究[D].徐州:中国矿业大学矿业工程学院,2009.
[1]孙琦,李喜林,卫星,等.硫酸盐腐蚀作用下膏体充填材料蠕变特性研究[J].中国安全生产科学技术,2015,11(3):12.[doi:10.11731/j.issn.1673-193x.2015.03.002]
SUN Qi,LI Xi-lin,WEI Xing,et al.Study on creep property of paste filling materials under sulfate corrosion[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(2):12.[doi:10.11731/j.issn.1673-193x.2015.03.002]
[2]王明旭,许梦国,陈郑亮.剥落型矿柱与早强胶结充填体相互作用损伤演化分[J].中国安全生产科学技术,2017,13(3):69.[doi:10.11731/j.issn.1673-193x.2017.03.011]
WANG Mingxu,XU Mengguo,CHEN Zhengliang.Analysis on interaction between spalling type pillar and early strength cement filling body and damage evolution[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(2):69.[doi:10.11731/j.issn.1673-193x.2017.03.011]
[3]王明旭,程爱平,刘晓云.早强充填体与矿柱相互作用的声发射特征试验研究[J].中国安全生产科学技术,2017,13(4):10.[doi:10.11731/j.issn.1673-193x.2017.04.002]
WANG Mingxu,CHENG Aiping,LIU Xiaoyun.Experimental study on acoustic emission characteristics of interaction between early strength filling body and pillar[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(2):10.[doi:10.11731/j.issn.1673-193x.2017.04.002]
[4]张寅,尹立冬,张季平,等.动力扰动下高应力巷道钻孔消能机制的数值研究*[J].中国安全生产科学技术,2023,19(9):61.[doi:10.11731/j.issn.1673-193x.2023.09.009]
ZHANG Yin,YIN Lidong,ZHANG Jiping,et al.Numerical study on energy dissipation mechanism of high stress tunnel borehole under dynamic disturbance[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(2):61.[doi:10.11731/j.issn.1673-193x.2023.09.009]