[1]张力霆.尾矿库溃坝研究综述[J]. 水利学报, 2013, 44(5): 594-600.
ZHANG Liting. Summary on the dam-break of tailing pond[J]. Journal of Hydraulic Engineering, 2013, 44(5): 594-600.
[2]王晋淼,贾明涛,王建,等. 基于物元可拓模型的尾矿库溃坝风险评价研究[J]. 中国安全生产科学技术, 2014, 10(4): 96-102.
WANG Jinmiao,JIA Mingtao,WANG Jian,et al. Risk evaluation of break-dam in tailings reservoir based on matter-element extension model[J]. Journal of Safety Science and Technology,2014, 10(04): 96-102.
[3]郑欣, 李全明, 许开立,等. 考虑变量相关性的尾矿坝坡失稳溃坝概率计算方法[J]. 中国安全生产科学技术, 2015, 2(2):23-27.
ZHENG Xin,LI Quanming,XU Kaili,et al. Calculation method on probability of tailings dam failure caused by dam slope instability considering correlation of variables[J].Journal of Safety Science and Technology,2015,2(2):23-27.
[4]李全明,张兴凯,王云海,等. 尾矿库溃坝风险指标体系及风险评价模型研究[J]. 水利学报, 2009(8): 989-994.
LI Quanming,ZHANG Xingkai,WANG Yunhai,et al. Risk index system and evaluation model for failure of tailings dams[J].Journal of Hydraulic Engineering,2009(08): 989-994.
[5]郭朝阳,唐治亚. 尾矿库溃坝模型探讨[J]. 中国安全生产科学技术, 2010, 6(1): 63-67.
GUO Zhaoyang,TANG Zhiya. Study on the tailings dam-break model[J]. Journal Of Safety Science And Technology, 2010, 6(1): 63-67.
[6]李仲学,曹志国,赵怡晴. 基于Safety case和PDCA的尾矿库安全保障体系[J]. 系统工程理论与实践, 2010(5): 936-944.
LI Zhongxue,CAO Zhiguo,ZHAO Yiqing. Safety case and PDCA based safety assurance system for mine tailings facilities[J]. Systems Engineering-Theory & Practice, 2010(05): 936-944.
[7]梅国栋,王云海. 我国尾矿库事故统计分析与对策研究[J]. 中国安全生产科学技术, 2010, 6(3): 211-213.
MEI Guodong,WANG Yunhai. Statistic analysis and countermeasure study on tailings pond accidents in China[J]. Journal Of Safety Science And Technology, 2010, 6(3): 211-213.
[8]Rico M, Benito G,Salgueiro A R,et al. Reported tailings dam failures: A review of the European incidents in the worldwide context[J]. Journal of Hazardous Materials, 2008, 152(2): 846-852.
[9]廖文景,皇甫凯龙,何易,等. 尾矿库实时监控与安全分析及预警耦合系统[J]. 中国安全科学学报, 2014(8): 158-163.
LIAO Wenjing,HUANGFU kailong,He Yi,et al. Integrated real-time monitoring,analyzing and analyzing pre-warning system for tailings reservoir[J]. China Safety Science Journal,2014(08): 158-163.
[10]张登,简文彬,叶琪,等. 尾矿库边坡时变分析模型及其应用[J]. 岩土力学, 2014(3): 835-840.
ZHANG Deng,JIAN Wenbin, YE Qi, et al. A time-varying analytic model of tailings slope and its application[J].Rock and Soil Mechanics, 2014(03): 835-840.
[11]张铎,刘洋,吴顺川,等. 基于离散-连续耦合的尾矿坝边坡破坏机理分析[J]. 岩土工程学报, 2014(8): 1473-1482.
ZHANG Duo,LIU Yang, WU Shunchuan,et al. Failure mechanism analysis of tailing dams based on coupled discrete and continuous method[J]. Chinese Journal of Geotechnical Engineering, 2014(8): 1473-1482.
[12]冀红娟,杨春和,张超,等. 尾矿库环境影响指标体系及评价方法及其应用[J]. 岩土力学, 2008, 29(8): 2087-2091.
JI Hongjuan,YANG Chunhe,ZHANG Chao,et al. Index system of environmental impact of tailings pond and application of assessment approach[J]. Rock and Soil Mechanics,2008, 29(8): 2087-2091.
[13]张志军,李亚俊,贺桂成,等. 某尾矿坝毛细水带内的坝体材料物理力学特性研究[J]. 岩土力学, 2014(6): 1561-1568.
ZHANG Zhijun,LI Yajun,HE Guicheng,et al. Study of physico-mechanical properties of dam body materials in capillary water fringe of a certain tailings dam[J]. Rock and Soil Mechanics,2014(6): 1561-1568.
[14]李全明,陈立宏,王云海,等. 尾矿坝堆坝材料非线性力学特性试验研究及数学模型拟合[J]. 安全与环境学报, 2009(5): 132-135.
LI Quanming,CHEN Lihong,WANG Yunhai,et al. On the non-linear mechanical characteristics of tailing reservoir and a numerical model fitting[J]. Journal Of Safety And Environment, 2009(5): 132-135.
[15]施富强. 矿山数字化建设战略与战术研究[J]. 爆破, 2013, 30(2): 37-40.
SHI Fuqiang.Research on strategy and tactics of construction of mine digitization[J].Blasting,2013, 30(2): 37-40.
[1]贾虎军,王立娟,靳晓,等.基于无人机航测的尾矿库三维空间数据获取与风险分析[J].中国安全生产科学技术,2018,14(7):115.[doi:10.11731/j.issn.1673-193x.2018.07.017]
JIA Hujun,WANG Lijuan,JIN Xiao,et al.Threedimensional spatial data acquisition and risk analysis of tailings pond based on UAV aerial survey[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(1):115.[doi:10.11731/j.issn.1673-193x.2018.07.017]