[1]韩斌, 吴爱祥, 邓建.基于可靠度理论的下向进路胶结充填技术分析[J].中南大学学报:自然科学版, 2006, (3): 31
HAN Bin, WU Aixiang, DENG Jian, et al. Backfill technical analysis based on reliability theory in the underhand drift cutandfilling stoping[J]. Journal of Central South University:Science and Technology, 2006, (3): 31
[2]杨红伟, 赵彬, 蒲成志.下向进路人工假顶失稳机理研究[J].现代矿业,2009,(12):13-15
YANG Hongwei, ZHAO Bin, PU Chenzhi. Research on instability mechanism of artificial roof of underhand drif[J].Morden Mining,2009,(12):13-15
[3]江文武, 徐国元, 中国生.下向分层进路式胶结充填体顶板稳定性分析[J].江西有色金属,2007,21(4):12-15
JIANG Wenwu,XU Guoyuan,ZHONG Guosheng. Analysis on stability of cemented fills ceiling of underhand delamination heading[J].Jiangxi Nonferrous Metals,2007,21(4):12-15
[4]赵伏军, 李夕兵, 赵国彦.进路法回采顶柱人工假顶的稳定性分析[J].金属矿山, 2002,(4):27-29
ZHAO Fujun,LI Xibin,ZHAO Guoyan. Stability analysis of the artificial roof in drift stoping of crown pillar[J].Metal Mine,2002,(4):27-29
[5]黄玉诚, 孙恒虎.高水固结充填下向进路假顶参数设计方法[J].有色金属, 2001,53(2):15-17
HUANG YuCheng,SUN Henghu. Determining method of the artificial roof in underhand drift of high water material backfill[J]. Nonferrous Metals,2001,53(2):15-17
[6]范文录, 李夕兵, 周子龙. 基于可靠度理论的钢筋混凝土假顶强度确定与配筋设计研究[J]. 矿冶工程,2013,33(4):30-35
FAN Wenlu,LI Xibing,ZHOU Zilong.Strength determinaton for reinforced concrete false roof and reinforcement design based on reliability theory[J]. Mining and Metallurgical Engineering,2013, 33(4):30-35
[7]韩斌, 张升学, 邓建.基于可靠度理论的下向进路充填体强度确定方法[J].中国矿业大学学报,2006,35(3):372-376
HAN Bin,ZHANG Shengxue,DENG Jian. Determining method of backfill strength for underhand drift cutandfill stopping based on reliability theory [J]. Journal of China University of Mining & Technology,2006,35(3):372-376
[8]王新民, 徐东升.下向进路采矿法充填体质量的综合评价[J]. 中国矿业,2006,15(11):62-65
WANG Xinmin,XU Dongsheng. Comprehensive evaluation of the filling body quality in downward drift stoping [J].China Mining Magazine,2006,15(11):62-65
[9]谢盛青, 王新民, 史良贵.人工假顶充填体稳定性数值分析[J].金属矿山, 2009,(9):44-47
XIE Shengqing,WANG Xinmin,SHI Lianggui. Stability numerical analysis of artificial roof filling body[J]. Metal Mine, 2009,(9):44-47
[10]方秦, 还毅, 张亚栋.ABAQUS混凝土损伤塑性模型的静力性能分析[J].解放军理工大学学报, 2007,8(3):254-260
FANG Qin,HUAN Yi,ZHANG Yadong.Investigation into static properties of damaged plasticity model for concrete in ABAQUS[J]. Journal of PLA University of Science and Technology, 2007,8(3):254-260
[11]沈新普, 王琛元, 周琳.一个钢筋混凝土损伤塑性本构模型及工程应用[J]. 工程力学,2007,24(9):122-128
SHEN Xinpu,WANG Shenyuan,ZHOU Lin. A damage plastic constitutive model for reinforced concrete and its engineering application [J].Engineering Mechanics,2007,24(9):122-128
[12]赵宝友,马震岳,梁冰,等.基于损伤塑性模型的地下洞室结构地震作用分析[J].岩土力学,2009,30(5):1515-1521
ZHAO Baoyou, MA Zhenyue, LIANG Bing,et al.Seismic analysis of underground structures based on damaged plasticity model[J].Rock and Soil Mechanics, 2009,30(5):1515-1521
[13]还毅,方秦,陈力,柳锦春.强震作用下地铁车站结构损伤破坏的三维非线性动力分析[J].北京工业大学学报,2011,37(6):853-862
HUAN Yi, FANG Qin, CHEN Li, et al. 3D nonlinear damage analysis of metrostation structures under strong seismic loading [J].Journal of Beijing University of Technology,2011,37(6):853-862
[14]陈学华, 万长涛, 周建伟.大采深沿空掘巷煤柱尺寸的数值模拟[J].科技导报,2012,30(34):51-53
CHEN Xuehua, WAN Changtao, ZHOU Jianwei.Numerical simulation for size of coal pillar of large mining depth along gobside entry driving direction [J]. Science and Technology Review,2012,30(34):51-53