[1]王德明.矿井通风与安全[M].徐州:中国矿业大学出版社,2009[2] 孔庆君.局扇长距离供风技术在掘进工作面中的应用[J],淮南职业技术学院学报,2008.2[2] Kong Q J.Application of Wind Feed Technology Using the Long-distance High –power Fan in the Heading Face[J],Journal of Huainan Vocational & Technical College,2008.2[3]刘后金译.风筒漏风及局部系统的设计[J].译自《The Mining Engineer》,1983.vo1.143[3]Translated by Liu H J.The Design of air leakage and Auxiliary System of Tubing [J].Translated from《The Mining Engineer》,1983.vo1.143[4] 金恒斌.对胶皮风筒的风阻、漏风率和风量计算的探讨[J].煤矿安全,1980.5[4] Jin H B.The Study on Resistance , Air Leakage Rate and Air Quantity of Rubber Tubing[J].Safety in Coal Mines,1980.5[5] 陈启付.矿山巷道沿程连续分布漏风若干问题的探讨[J],工业安全与环保,1989.2[5] Chen Q F.Discussion on Several Questions of Continuous Air leakage along Mining Roadway [J],Industrial Safety and Dust Control,1989.2[6] 毕玉忠.掘进通风柔性风筒接头连接方法简介[J],江苏煤炭,1995.1[6] Bi Y Z.Introduction of Connecting methods of Flexible Tubing in Digging Course[J],Jiangsu Coal,1995.1[7] 陆愈实,张国屏.柔性风筒接口性能的综合评价[J],探矿工程,1992.4[7] Lu Y S,Zhang G P.Comprehensive Evaluation on the Properties of the Joint for Flexible Ventilator Pipe[J],Exploration Engineering,1992.4[8] 卢道民,高有存.独头掘进长距离通风技术的应用[J],煤炭科技,2009.3[8] Lu D M,Gao Y C.Application of Ventilation Technology in Single long Advancing Roadway [J],Coal Technology,2009.3[9] 焦健.长巷掘进的通风技术与安全管理[J],煤,2005.1[9] Jiao J.Ventilation Technology and Safety Management in long Advancing Roadway [J],Coal,2005.1[10] 郭凡进.对《规程》中放顶煤开采和掘进工作面局部通风有关条款执行问题的探讨[J],煤矿安全,2005.4[10] Guo F J.Discussion on Execution of Rules about Auxiliary Ventilation of Top -Caving Coal Mining and Digging Face [J],Safety in Coal Mines,2005.4[11] 张军.大直径风筒在掘进工作面的应用[J],煤炭技术,2007.7[11] Zhang J.Application of Big Diameter Blowing Tube at Digging Face[J],Coal Technology,2007.7