|本期目录/Table of Contents|

[1]赵忠理,张明,胡川,等.高头窑煤矿河流下浅埋煤层综放开采安全限采研究[J].中国安全生产科学技术,2011,7(5):21-25.
 ZHAO Zhong-li,ZHANG Ming,HU Chun,et al.Study on safe mining height of top coal caving for shallow buried coal seam under rivers in Gaotouyao coal mine[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):21-25.
点击复制

高头窑煤矿河流下浅埋煤层综放开采安全限采研究()
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
7
期数:
2011年5期
页码:
21-25
栏目:
学术论著
出版日期:
2011-05-30

文章信息/Info

Title:
Study on safe mining height of top coal caving for shallow buried coal seam under rivers in Gaotouyao coal mine
文章编号:
1673-193X(2011)-05-0021-05
作者:
赵忠理1张明1胡川2刘志仲2
1.内蒙古北联电能源开发有限责任公司,呼和浩特 010020
2.中国矿业大学(北京)力学与建筑工程学院,北京 100083
Author(s):
ZHAO Zhong-li1 ZHANG Ming1 HU Chun2 LIU Zhi-Zhong2
1. Inner Mongolia Beilian Electric Energy Development Corporation,? Hohhot ?010020, China
2. School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing? 100083, China
关键词:
导水裂隙带河流下浅埋煤层采高控制
Keywords:
Water flowing fracture zoneUnder river Shallow buried coal seammining height control
分类号:
X936
DOI:
-
文献标志码:
A
摘要:
导水裂隙带高度是水体下安全采煤的主要依据,本文通过数值计算、相似材料模拟、规程预测和工程类比等方法,对高头窑煤矿水多湖川和大哈他土沟河下浅埋煤层开采时导水裂隙带高度进行了预测研究,结果表明:几种方法预测结果有一定的误差,综合工程类比结果,高头窑煤矿水多湖川和大哈他土沟下采煤时裂采比定为15。由于高头窑煤矿2-3煤层上覆基岩段厚度较薄,根据三下开采规程,煤层开采需要进行安全限采控制,采高h≤H/19,以达到控制导水裂隙带高度的目的,实现河下采煤的安全开采。
Abstract:
The height of water conducted fissure is the main basis for coal mining under water. In this paper, using the methods of the procedures forecast, numerical simulation, equivalent material simulation and engineering analogy, the height of water conducted fissue was analyzed for shallow buried coal seam under the rivers Shuiduohuchuan and Dahatatugou in Gaotouyao Coal Mine. The results showed that there was an error for these forcasting results, and combined with engineering analogy, the ratio of the height of the fractured zone to the mining height is 15 under the rivers Shuiduohuchuan and Dahatatugou. Because the overlying strata on 2-3 coal seam is thin in Gaotouyao Coal Mine, according to coal mining regulations,the mining height must be controled, , in order to reach the purpose of controling the height of water conducted fissure and achieve the safety mining under the rivers.

参考文献/References:

[1] 缪协兴,浦海,白海波. 隔水关键层原理及其在保水采煤中的应用研究 [J]. 中国矿业大学学报,2010, 37(1):1-4.MIAO Xie-xing, PU Hai, BAI Hai-bo. Principle of water2resisting key strata and ite application in water 2preserved mining [J]. Journal of China University of Mining & Technology, 2008, 37(1): 1-4.[2] 杨天鸿,唐春安,谭志宏. 岩体破坏突水模型研究现状及突水预测预报研究发展趋势 [J[. 岩石力学与工程学报,2007,26(2):268-277.YANG Tian-hong, TANG Chun-an, TAN Zhi-hong. State of the art of inrush models in rock mass failure and developing trend for predication and forecast of groundwater inrush [J]. Chinese Journal of Rock Mechanics and Engineering, 2007,26(2):268-277.[3] 武强,周英杰,刘金韬,等,煤层底板断层滞后型突水时效机理的力学试验研究[J]. 煤炭学报,2003,28(6):561-565.WU Qiang, ZHOU Yin-jie, LIU Jin-tao, et al. The mechanical experiment study on lag mechanism of water-bursting of fault under coal seam [J]. Journal of China Coal Society, 2003,28(6):561-565.[4] 王剑峻,矿井奥灰水安全防治与利用[J],中国安全生产科学技术,2008,4(2):130-132WANG Jian-jun,Safety Control and Utilization of Ordovician Limeston Water in Mine[J], Journal of Safety Science and Technology, 2008,4(2):130-132[5] 李湖生,刘铁民,从“3.28”王家岭煤矿透水事故抢险救援反思中国事故灾害应急准备体系,中国安全生产科学技术[J],2010,6(4):5-12LI Hu-sheng, LIU Tie-min, Reflection of the Chinese Disaster Emergency Preparedness System Based on the Analysis of the “3.28” Wangjialing Coalmine Flooding Accient Rescue[J], Journal of Safety Science and Technology, 2010,6(4):5-12[6] 马亚杰,武强,章之燕等,煤层开采顶板导水裂隙带高度预测研究[J],煤炭科学技术,2008,36(5):59-62MA Ya-jie,WU Qiang, ZHANG Zhi-yan, Research on prediction of water conductred fissure height in roof of coal mining seam[J], Coal Science abd Technology, 2008,36(5):59-62[7] 王双美,导水裂隙带高度研究方法概述[J],水文地质工程地质,2006,33(5):126-128WANG Shuang-mei, Abrief review of the mothods determining the height of permrable fracture zone[J], Hydrogeology and Engineering Geology,2006,33(5):126-128[8]王经明,马茂盛,王勇,沙下大采高采煤导水裂隙带高度确定[J],煤田地质与勘探,1999,27(2):45-48The high determination of conductive fracture induced by high mining under deseat[J],Coal Geology and Exploration,1999,27(2):45-48[9] 秦忠诚,赵枝业,路光秋,杨村煤矿薄基岩区提高综放面开采上限试验[J],煤炭科学技术,2008,36(2):19-22QIN Zhong-cheng, ZHAO Zhi-ye, LU Guang-qiu, Experiment on mineing upper limit improvemrnt for fully mechanized longwall top coal caving mining face with thin overburden benrock in Yangcun mine[J], Coal Science abd Technology, 2008,36(2):19-22[10] 国家煤炭工业局,建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M],2000,煤炭工业出版社

相似文献/References:

[1]郭超,张宏伟,宋卫华,等.熵权属性测度理论在导水裂隙带高度预测中的应用[J].中国安全生产科学技术,2014,10(12):87.[doi:10.11731/j.issn.1673-193x.2014.12.015]
 GUO Chao,ZHANG Hong-wei,SONG Wei-hua,et al.Application of entropy weight attribute measure theory for predicting the height of water flowing fractured zone[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(5):87.[doi:10.11731/j.issn.1673-193x.2014.12.015]

备注/Memo

备注/Memo:
收稿日期:2011-02-06
基金项目:国家973项目(编号:2007CB209402)
更新日期/Last Update: