[1]谢春华.无中导洞城市连拱隧道施工工法分析研究 [J].中外公路,2017,37(4):214-218.XIE Chunhua.Analysis and study of construction method of urban continuous arch tunnel without middle guide tunnel[J].Journal of China & Foreign Highway,2017,37(4):214-218.
[2]曾维成,周应新,翟俊莅,等.连拱隧道无中导洞施工技术与监测分析 [J].地下空间与工程学报,2019,15(增刊1):361-366.ZENG Weicheng,ZHOU Yingxin,ZHAI Junli,et al.Construction technology without middle drift and monitoring analysis of double-arch tunnel [J].Chinese Journal of Underground Space and Engineering,2019,15(Supplement 1):361-366.
[3]刘元雪,蒋树屏,蒋再文,等.黄土连拱隧道两主洞开挖面合理间距研究 [J].现代隧道技术,2006(3):6-11.LIU Yuanxue,JIANG Shuping,JIANG Zaiwen,et al.Study on the reasonable spacing between two tunnels of a multi-arch loess tunnel [J].Modern Tunneling Technology,2006(3):6-11.
[4]胡志平,刘佳琪,任翔,等.黄土地区浅埋暗挖地铁连拱隧道合理错距研究 [J].铁道工程学报,2020,37(9):60-65.HU Zhiping,LIU Jiaqi,REN Xiang,et al.Research on the reasonable staggered distance of tunnel in shallow excavated metro arch tunnel in the loess area [J].Journal of Railway Engineering Society,2020,37(9):60-65.
[5]邵珠山,王孟辉.黄土地区非对称小净距隧道的合理错距研究 [J].长江科学院院报,2022,39(10):80-87.SHAO Zhushan,WANG Menghui.Reasonable offset of asymmetric tunnel with small clear distance in loess area [J].Journal of Yangtze River Scientific Research Institute,2022,39(10):80-87.
[6]宋战平,王童,周建军,等.浅埋偏压大断面隧道施工优化及受力特征分析 [J].地下空间与工程学报,2017,13(2):459-468.SONG Zhanping,WANG Tong,ZHOU Jianjun,et al.Analysis of construction optimization and mechanical characteristic of shallow large section tunnel [J].Chinese Journal of Underground Space and Engineering,2017,13(2):459-468.
[7]卢小刚,耿建宇,庞雷,等.无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析 [J].现代隧道技术,2022,59(5):80-90,98.LU Xiaogang,GENG Jianyu,PANG Lei,et al.Analysis of construction optimization and mechanical characteristic of shallow large section tunnel [J].Modern Tunneling Technology,2022,59(5):80-90,98.
[8]李波,吴立,左清军,等.复杂地质条件下特大断面隧道施工工法及其循环进尺参数的优化研究 [J].安全与环境工程,2014,21(4):159-164.LI Bo,WU Li,ZUO Qingjun,et al.Study on the optimization of construction methods and circulation measurement parameters for super-large cross section tunnel under complicated geological conditions [J].Safety and Environmental Engineering,2014,21(4):159-164.
[9]庄宁,朱苦竹,李军伟.偏压连拱隧道施工的动态模拟及最优化分析 [J].岩土力学,2009,30(9):2875-2880.ZHUANG Ning,ZHU Kuzhu,LI Junwei.Research on partial pressure joint arch tunnel’s dynamic simulation and optimum analysis of construction process [J].Rock and Soil Mechanics,2009,30(9):2875-2880.
[10]朱正国,乔春生,高保彬.浅埋偏压连拱隧道的施工优化及支护受力特征分析 [J].岩土力学,2008(10):2747-2752,2758.ZHU Zhengguo,QIAO Chunsheng,GAO Baobin.Analysis of construction optimization and supporting structure under load of shallow multi-arch tunnel under unsymmetrical pressure [J].Rock and Soil Mechanics,2008(10):2747-2752,2758.
[11]刘新荣,孙辉,陈晓江,等.黄土连拱隧道中墙结构的数值模拟研究 [J].地下空间与工程学报,2005(6):837-840.LIU Xinrong,SUN Hui,CHEN Xiaojiang,et al.Numerical analysis on mid-partition structure of the loess double arch tunnel [J].Chinese Journal of Underground Space and Engineering,2005(6):837-840.
[12]王少强,乔春生,徐干成,等.复杂地质条件下偏压连拱隧道中隔墙变形与受力特征 [J].岩土力学,2007,28(增刊1):449-454.WANG Shaoqiang,QIAO Chunsheng,XU Gancheng,et al.Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions [J].Rock and Soil Mechanics,2007,28(Supplement 1):449-454.
[13]夏永旭,王文正,胡庆安.公路双连拱隧道施工过程中中隔墙的变形及稳定性 [J].中国公路学报,2007(5):83-88.XIA Yongxu,WANG Wenzheng,HU Qing’an.Deformation and stability of mid-board in process of highway double-arch tunnel construction [J].China Journal of Highway and Transport,2007(5):83-88.
[14]张志强,何川.连拱隧道中隔墙设计与施工力学行为研究 [J].岩石力学与工程学报,2006(8):1632-1638.ZHANG Zhiqiang,HE Chuan.Study on mechanical behaviors of designing and construction for center pillar of double-arched tunnel [J].Chinese Journal of Rock Mechanics and Engineering,2006(8):1632-1638.
[15]曾宪营,黄亮.高速公路连拱隧道中隔墙受力数值模拟及量测 [J].武汉理工大学学报,2008(7):75-78.ZENG Xianying,HUANG Liang.Numerical simulation of middle wall in expressway multiple arch tunnel [J].Journal of Wuhan University of Technology,2008(7):75-78.
[16]吴梦军,张永兴,刘新荣,等.六车道连拱隧道中墙动态施工力学研究[J].地下空间与工程学报,2011,7(4):671-675.WU Mengjun,ZHANG Yongxing,LIU Xinrong,et al.Research on dynamic construction mechanics for six-lane multi-arch tunnel middle wall [J].Chinese Journal of Underground Space and Engineering,2011,7(4):671-675.
[17]张富鹏,雷胜友,杨瑞,等.超小净距分岔式隧道施工方法数值模拟研究 [J].中国科技论文,2019,14(2):157-163,209.ZHANG Fupeng,LEI Shengyou,YANG Rui,et al.Numerical simulation of the construction of forked tunnels with super small spacing [J].China Sciencepaper,2019,14(2):157-163,209.
[18]高登,林孔斌.扩建连拱隧道初期支护及中墙受力研究 [J].公路交通技术,2018,34(增刊1):12-17.GAO Deng,LIN Kongbin.Mechanical analysis of initial support and central wall of double-arch tunnel expansion [J].Highway Traffic Technology,2018,34(Supplement 1):12-17.
[19]曾胜,覃庆通,阳军生.大跨度连拱隧道直中墙受力现场监测分析 [J].岩土力学,2008(9):2537-2541.ZENG Sheng,QIN Qingtong,YANG Junsheng.In-situ monitoring behaviors of middle wall of large-span multi-arch tunnel [J].Rock and Soil Mechanics,2008(9):2537-2541.
[20]来弘鹏,谢永利,杨晓华.不同应力场软弱围岩公路连拱隧道中墙受力特征 [J].长安大学学报(自然科学版),2010,30(6):50-55.LAI Hongpeng,XIE Yongli,YANG Xiaohua.Stress characteristics of middle wall in soft-wreak surrounding rocks highway multiple-arch tunnel under different stress field [J].Journal of Chang’an University (Natural Science Edition),2010,30(6):50-55.
[1]刘晓,陈跃,周飞,等.双连拱隧道无导洞施工技术及变形特征研究[J].中国安全生产科学技术,2023,19(11):135.[doi:10.11731/j.issn.1673-193x.2023.11.019]
LIU Xiao,CHEN Yue,ZHOU Fei,et al.Research on construction technology and deformation characteristics of double-arch tunnel without guide hole[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(3):135.[doi:10.11731/j.issn.1673-193x.2023.11.019]