|本期目录/Table of Contents|

[1]王超,李亮,文嘉辉,等.初期坝顶部单排水平排渗管布设对尾矿坝稳定性的影响*[J].中国安全生产科学技术,2024,20(2):125-131.[doi:10.11731/j.issn.1673-193x.2024.02.017]
 WANG Chao,LI Liang,WEN Jiahui,et al.Influence of single-row horizontal drainage pipe layout at top of initial dam on stability of tailings dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2024,20(2):125-131.[doi:10.11731/j.issn.1673-193x.2024.02.017]
点击复制

初期坝顶部单排水平排渗管布设对尾矿坝稳定性的影响*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
20
期数:
2024年2期
页码:
125-131
栏目:
职业安全卫生管理与技术
出版日期:
2024-02-29

文章信息/Info

Title:
Influence of single-row horizontal drainage pipe layout at top of initial dam on stability of tailings dam
文章编号:
1673-193X(2024)-02-0125-07
作者:
王超李亮文嘉辉蔡凤珍徐亮
(青岛理工大学 土木工程学院,山东 青岛 266520)
Author(s):
WANG Chao LI Liang WEN Jiahui CAI Fengzhen XU Liang
(School of Civil Engineering,Qingdao University of Technology,Qingdao Shandong 266520,China)
关键词:
尾矿坝排渗管浸润线稳定性分析
Keywords:
tailings dam drainage pipe phreatic line stability analysis
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2024.02.017
文献标志码:
A
摘要:
为揭示初期坝顶部单排布设水平排渗管对尾矿坝稳定性的影响机理,以山东某尾矿库为工程研究对象,将排渗管等效为具有特定饱和渗透系数的材料,基于达西渗流定律以及极限平衡理论,研究不同干滩长度下安全系数随排渗管长度和渗透系数的变化规律,建立最优排渗管长度与干滩长度之间的定量关系,提出初期坝排渗管与坝顶抽水泵协同工作汛期抢险救灾技术。研究结果表明:初期坝顶部水平布设排渗管以及与尾矿坝顶抽水泵协同工作技术可以有效降低坝体内浸润线位置,提高坝体稳定性。研究结果可为汛期尾矿坝排渗提供强有力的技术支持。
Abstract:
In order to reveal the influence of single-row horizontal drainage pipe layout at the top of initial dam on the stability of tailings dam,taking a tailings pond in Shandong as the engineering research object,the drainage pipe was equivalent to the material with specific saturated permeability coefficient.Based on Darcy’s seepage law and limit equilibrium theory,the variation of safety factor with the length and permeability coefficients of drainage pipe under different dry beach lengths was studied.The quantitative relationship between the optimal length of drainage pipe and the length of dry beach was established,and the emergency rescue and disaster relief technology with the cooperative work of the drainage pipe of initial dam and the suction pump at dam top in flood season was put forward.The results show that the cooperative work technology of the horizontal drainage pipe layout at the top of initial dam and the suction pump at the top of tailings dam can effectively reduce the phreatic line position in the dam and significantly improve the stability of tailings dam.The research results provide much strong technical support for the tailings dam drainage in the flood season.

参考文献/References:

[1]代纪元,刘果,张军伟,等.尾矿坝地下水位变化规律的试验研究[J].有色金属,2011,63(2):239-241. DAI Jiyuan,LIU Guo,ZHANG Junwei,et al.Experimental study on phreatic surface of tailings dam[J].Nonferrous Metals Engineering,2011,63(2):239-241.
[2]刘哲钧,屈书元.轻型井点降低尾矿坝浸润线的试验研究[J].金属矿山,1987(4):32-36. LIU Zhejun,QU Shuyuan.Experimental study on lowering tailings dam infiltration line at light well point[J].Metal Mine,1987(4):32-36.
[3]卜盛文.联合排渗法降低尾矿库浸润线的实践[J].有色金属(选矿部分),1999(1):42-43,41.
[4]沈献林.水平排渗技术在钟山铁矿尾矿坝上的应用[J].金属矿山,1998(12):38-39.
[5]周仕龙,陈守仁.水平滤管和滤水碎石坑在尾矿坝降水中的应用[J].金属矿山,2003(6):63-64. ZHOU Shilong,CHEN Shouren.Applicatoin of horizontal filter pipe and water filtering gravel pit in lowering the seepage line of tailings dam[J].Metal Mine,2003(6):63-64.
[6]刘昌军.虹吸井子结构法在尾矿坝复杂渗流场求解中的应用[J].水利水电科技进展,2011,31(3):65-69. LIU Changjun.Application of siphon well substructure method in solution to complex seepage fields of tailing dams[J].Advances in Science and Technology of Water Resources,2011,31(3):65-69.
[7]程军,邓汉成.软式透水管在白雉山尾矿库中的应用[J].中国矿业,2004(4):80-82. CHENG Jun,DENG Hancheng.Application of soft perviious pipe in baizhishan’s tailings storehouse[J].China Mining Magazine,2004(4):80-82.
[8]张磊,徐力群,杨兰兰.一种新型尾矿库排渗竖管垂直排渗方法及其效果分析[J].水电能源科学,2013,31(6):122-124. ZHANG Lei,XU Liqun,YANG Lanlan.Segmental construction tailings dam seepage pipe and its seepage effect analysis[J].Water Resources and Power,2013,31(6):122-124.
[9]徐力群,贾凡,徐琼,等.虹吸管与辐射井相结合的尾矿坝排渗系统排渗效果分析[J].水电能源科学,2014,32(9):94-97,74. XU Liqun,JIA Fan,XU Qiong,et al.Analysis of drainage effect of tailings dam drainage system combining siphon and radiation well[J].Water Resources and Power,2014,32(9):94-97,74.
[10]陈嘉帅,刘小文.水平排渗管对尾矿堆积坝渗流场影响三维分析[J].轻金属,2020(2):1-8. CHEN Jiashuai,LIU Xiaowen.Influence of different drainage pipe arrangement schemes on the seepage line of seepage field in tailings reservoir [J].Light Metals,2020(2):1-8.
[11]杨春和,阎金安.土工织物在尾矿坝排渗处理中的应用[J].水力发电学报,1991(4):64-68.
[12]金松丽,徐宏达,张伟,等.细粒尾矿坝槽孔管排渗机理及其计算方法[J].金属矿山,2013(3):42-44. JIN Songli,XU Hongda,ZHANG Wei,et al.Research on calculation method and drainage mechanism of slotted pipe in fine-grained tailings dam[J].Metal Mine,2013(3):42-44.
[13]吕军.深层排水管布设方式对土质路堑边坡稳定性的影响[J].公路与汽运,2016(6):137-140.
[14]GASMO J M,RAHARDJ O H,LEONG E C.Infiltration effects on stability of a residual soil slope [J].Computers and Geotechnics,2000,26(2):145-165.
[15]刘胜,王媛,冯迪.尾矿库中新型复合排渗管排渗特征试验研究[J].岩土工程学报,2019,41(12):2360-2366. LIU Sheng,WANG Yuan,FENG Di.Experimental study on drainage characteristics of new composite drainage pipes in tailings pond[J].Chinese Journal of Geotechnical Engineering,2019,41(12):2360-2366.
[16]VANAPALLI S K,FREDLUND D G,PUFAHL D E,et al.Model for the prediction of shear strength with respect to soil suction[J].Canadian Geotechnical Journal,1996(33):379-392.
[17]中华人民共和国住房和城乡建设部.尾矿设施设计规范:GB 50863—2013[S].北京:中国计划出版社,2013.

相似文献/References:

[1]李亮,孟浩,全超,等.上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J].中国安全生产科学技术,2011,7(7):31.
 Li Liang,Meng Hao,Quan Chao,et al.Study on the variation of factor of safety with the dam height for the tailing dam from upstream embankment method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):31.
[2]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
 HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):64.
[3]李明,梁力,王伟,等.用有限元强度折减法求解坝坡抗滑稳定安全系数[J].中国安全生产科学技术,2012,8(2):83.
 LI Ming,LIANG Li,WANG Wei,et al.Study on antiskiding stability safety factor of dam slope by shear strength reduction finite element methods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):83.
[4]李亮,褚雪松.浸润线深度对尾矿坝稳定性分析的影响研究[J].中国安全生产科学技术,2011,7(11):20.
 LI Liang,CHU Xue-song.Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):20.
[5]魏〓勇,许开立.集对分析法在尾矿坝稳定性安全评价中的应用[J].中国安全生产科学技术,2012,8(9):101.
 WEI Yong,XU Kai li.Application of set pair analysis on safety evaluation of tailing dam stability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):101.
[6]赵小稚.尾矿坝变形规律的灰色Verhulst预测[J].中国安全生产科学技术,2012,8(11):90.
 ZHAO Xiao zhi.Grey verhulst prediction on the deformation law of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):90.
[7]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56.
 HU Ping-an,HAN Sen.Reach on reliability of Tailing dam stability based on JC methed[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):56.
[8]马海涛,吴永锋,王云海,等.尾矿坝浸润线的坝面快速观测方法研究[J].中国安全生产科学技术,2010,6(1):31.
 MA Hai-tao,WU Yong-feng,WANG Yun-hai,et al.Study on surface exploration meth of phreatic line of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):31.
[9]詹京晶,肖田元.基于GPS数据的尾矿坝监测系统的研究与应用[J].中国安全生产科学技术,2013,9(4):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
 ZHAN Jing jing,XIAO Tian yuan.Research and application of monitoring system for tailings dam based on GPS data[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
[10]秦晓鹏,陈立宏,孙洪月,等.基于拟静力法和有限差分法的细砂尾矿坝动力稳定性分析与评价[J].中国安全生产科学技术,2013,9(12):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]
 QIN Xiao peng,CHEN Li hong,SUN Hong yue,et al.Analysis and evaluation on dynamic stability of sand tailings dam based on pseudostatic method and finite difference method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]

备注/Memo

备注/Memo:
收稿日期: 2023-08-14
* 基金项目: 国家自然科学基金项目(52171264,51274126);山东省自然科学基金项目(ZR2023ME007)
作者简介: 王超,硕士研究生,主要研究方向为岩土工程防灾减灾。
通信作者: 李亮,博士,教授,主要研究方向为边坡稳定性分析、岩土工程可靠度和风险分析。
更新日期/Last Update: 2024-03-11