[1]强鲁.工业燃气应用系统的安全评价[D].上海:同济大学,2007.
[2]SHAHRIAR A,SADIQ R,TESFAMARIAM S.Risk analysis for oil & gas pipelines:A sustainability assessment approach using fuzzy based bow-tie analysis[J].Journal of Loss Prevention in the Process Industries,2012,25(3):505-523.
[3]KRAIDI L,SHAH R,MATIPA W,et al.Using stakeholders’ judgement and fuzzy logic theory to analyze the risk influencing factors in oil and gas pipeline projects:Case study in Iraq,Stage II[J].International Journal of Critical Infrastructure Protection,2020(28):100337.
[4]WU J S,ZHOU R,XU S D,et al.Probabilistic analysis of natural gas pipeline network accident based on Bayesian network[J].Journal of Loss Prevention in the Process Industries,2017(46):126-136.
[5]焦建瑛,吴波,顾先凯,等.层次分析法城镇燃气管道网格化风险评价[J].煤气与热力,2021,41(1):28-31,46.
JIAO Jianying,WU Bo,GU Xiankai,et al.Risk evaluation of urban gas pipeline grid by analytic hierarchy process [J].Gas & Heat,2021,41(1):28-31,46.
[6]于磊.在役聚乙烯燃气管道失效可能性风险评定应用研究[J].石油和化工设备,2021,24(11):127-131,126.
[7]BOBBIO A,PORTINALE L,MINICHINO M,et al.Improving the analysis of dependable systems by map-ping fault trees into Bayesian networks[J].Reliability Engineering and System Safety,2001,71(3):249-260.
[8]骆正山,巫忱忱.基于FTA-DBN的燃气管道泄漏风险研究[J].消防科学与技术,2020,39(3):401-404.
LUO Zhengshan,WU Chenchen.Research on risk of gas pipeline leakage based on FTA-DBN,[J].Fire Science and Technology,2020,39(3):401-404.
[9]WANG W,HE X N,LI Y T,et al.Risk analysis on corrosion of submarine oil and gas pipelines based on hybrid Bayesian network[J].Ocean Engineering,2022(260):111957.
[10]MIRZAEI M A,AFSHIN P,IRAJ M.Risk modelling of a hydrogen gasholder using fuzzy Bayesian network (FBN)[J].International Journal of Hydrogen Energy,2020,45(1):1177-1186.
[11]李宗坤,王特,葛巍,等.基于动态贝叶斯网络的混凝土坝失事风险分析[J].长江科学院院报,2021,38(5):137-143.
LI Zongkun,WANG Te,GE Wei,et al.Risk analysis of concrete dam breach based on dynamic Bayesian network[J].Journal of Yangtze River Scientific Research Institute,2021,38(5):137-143.
[12]张俊光,徐振超,贾赛可.基于Noisy-or Gate和贝叶斯网络的研发项目风险评估方法[J].科技管理研究,2015,35(1):193-196,206.
ZHANG Junguang,XU Zhenchao,JIA Saike,et al.Risk assessment on research and development project based on Noisy-or Gate and Bayesian network[J].Science and Technology Management Research,2015,35(1):193-196,206.