[1]田晓勇,冯延超,陈亮,等.考虑震后道路抢修的多目标应急调度模型[J].防灾减灾工程学报,2020,40(4):664-672.
TIAN Xiaoyong,FENG Yanchao,CHEN Liang,et al.Multi objective emergency dispatching model considering post-earthquake road repair [J].Journal of Disaster Prevention and Mitigation Engineering,2020,40(4):664-672.
[2]CHAI G,CAO J D,HUANG W,et al.Optimized traffic emergency resource scheduling using time varying rescue route travel time [J].Neurocomputing,2018,275:1567-1575.
[3]CHI H,LI J L,SHAO X Y,et al.Timeliness evaluation of emergency resource scheduling [J].European Journal of Operational Research,2017,258(3):1022-1032.
[4]DENG X P,CHEN L,TIAN S H.Research on multimodal transport path optimization with mixed time windows constraints [J].International Core Journal of Engineering,2020,6(3):125-129.
[5]吕伟,李志红,马亚萍,等.考虑受灾点需求时间窗的应急物资配送车辆路径规划研究[J].中国安全生产科学技术,2020,16(3):5-11.
LYU Wei,LI Zhihong,MA Yaping,et al.Research on route planning of emergency materials distribution vehicles considering time window of requirements by disaster point [J].Journal of Safety Science and Technology,2020,16(3):5-11.
[6]朱莉,顾珺,马铮,等.面向受灾差异的跨区域应急救援路径优化[J].控制与决策,2017,32(5):879-884.
ZHU Li,GU Jun,MA Zheng,et al.Routing optimization of cross-regional emergency rescue considering differentiated disaster impacts [J].Control and Decision,2017,32(5):879-884.
[7]CAO J,HAN H,JIANG Y P,et al.Emergency rescue vehicle dispatch planning using a hybrid algorithm [J].International Journal of Information Technology & Decision Making,2018,17(6):1865-1890.
[8]田志强,宋琦,潘金山,等.铁路突发事件应急救援设备调度优化研究[J].铁道科学与工程学报,2015,12(1):171-176.
TIAN Zhiqiang,SONG Qi,PAN Jinshan,et al.Optimization analysis of equipment dispatching under railway emergency event [J].Journal of Railway Science and Engineering,2015,12(1):171-176.
[9]王薇,武毅,赵阳,等.施工环境下高速公路应急资源调度方法研究[J].重庆交通大学学报(自然科学版),2019,38(2):102-108.
WANG Wei,WU Yi,ZHAO Yang,et al.Dispatching method of expressway emergency resources under construction environment [J].Journal of Chongqing Jiaotong University (Natural Science),2019,38(2):102-108.
[10]宋少忠,孔繁森,王利芳.多品种多供应点的物资调配和路线选择[J].吉林大学学报(工学版),2011,41(S2):144-148.
SONG Shaozhong,KONG Fansen,WANG Lifang.More varieties of material allocation and supply point route choice [J].Journal of Jilin University (Engineering and Technology Edition),2011,41(S2):144-148.
[11]王海鹰,孙刚,欧阳春,等.地震应急期关键时间阶段划分研究[J].灾害学,2013,28(3):166-169,197.
WANG Haiying,SUN Gang,OUYANG Chun,et al.Phases of earthquake emergency response period [J].Journal of Catastrophology,2013,28(3):166-169,197.
[12]国务院办公厅关于印发国家综合防灾减灾规划(2016-2020年)的通知[J].中华人民共和国国务院公报,2017(4):24-31.
[13]李福祥,徐朝霞,高国民,等.汶川地震搜救时间与现场幸存率的关系[J].中华急诊医学杂志,2009,18(4):420-422.
LI Fuxiang,XU Zhaoxia,GAO Guomin,et al.Research on the correlation between the rescue time and the spot survival rate during wenchuan earthquake [J].Chinese Journal of Emergency Medicine,2009,18(4):420-422.
[14]张浩.基于半参数加性logistic回归模型的交通事故紧急医疗救援响应时间的平滑效应分析[D].北京:北京交通大学,2018.
[15]陈桂秀,李生刚,赵虎.广义梯形模糊数与其重心间的关系(英文)[J].四川大学学报(自然科学版),2014,51(2):255-261.
CHEN Guixiu,LI Shenggang,ZHAO Hu.On the relation between a generalized trapezoidal fuzzy numbers and its centroid (English)[J].Journal of Sichuan University(Natural Science Edition),2014,51(2):255-261.
[16]郑远,杜豫川,孙立军.美国联邦公路局路阻函数探讨[J].交通与运输(学术版),2007(1):24-26.
ZHENG Yuan,DU Yuchuan,SUN Lijun.Considerations on problems in the BPR function [J].Traffic & Transportation,2007(1):24-26.
[17]程浩,朱从坤.基于TransCAD的BPR路阻函数对OD反推影响分析[J].价值工程,2018,37(1):205-208.
CHENG Hao,ZHU Congkun.Analysis of the effect of BPR road resistance function on OD inversing based on TransCAD [J].Value Engineering,2018,37(1):205-208.
[18]汤兆平,秦进,孙剑萍,等.不确定条件下铁路应急资源调度多目标优化方法研究[J].铁道学报,2018,40(1):9-16.
TANG Zhaoping,QIN Jin,SUN Jianping,et al.Multi-objective optimization method for dispatching of railway emergency resources under uncertainty conditions [J].Journal of the China Railway Society,2018,40(1):9-16.