|本期目录/Table of Contents|

[1]李常茂,祝和意.软土深基坑的空间变形特性分析及危险性评估*[J].中国安全生产科学技术,2021,17(1):116-121.[doi:10.11731/j.issn.1673-193x.2021.01.019]
 LI Changmao,ZHU Heyi.Spatial deformation characteristics analysis and risk assessment of deep foundation pit in soft soil[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(1):116-121.[doi:10.11731/j.issn.1673-193x.2021.01.019]
点击复制

软土深基坑的空间变形特性分析及危险性评估*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
17
期数:
2021年1期
页码:
116-121
栏目:
职业安全卫生管理与技术
出版日期:
2021-01-31

文章信息/Info

Title:
Spatial deformation characteristics analysis and risk assessment of deep foundation pit in soft soil
文章编号:
1673-193X(2021)-01-0116-06
作者:
李常茂祝和意
(陕西铁路工程职业技术学院,陕西 渭南 714000)
Author(s):
LI Changmao ZHU Heyi
(Shaanxi Railway Institute,Weinan Shaanxi 714000,China)
关键词:
地铁基坑空间变形支护结构危险性等级变形趋势
Keywords:
subway foundation pit spatial deformation support structure risk level deformation trend
分类号:
X947;TU9
DOI:
10.11731/j.issn.1673-193x.2021.01.019
文献标志码:
A
摘要:
为准确掌握软土深基坑的变形特性,并合理评价其危险性,基于现场监测成果,进行基坑重要监测项目的空间变形特征分析;通过变形分级和发展趋势判据计算得到相应特征指标,从而开展基坑危险性评估。结果表明:支护结构的空间变形近似呈“驼峰”特征,即基坑两端头的变形值相对较小,而基坑中部的变形值相对较大;周边土体沉降相对较小,随着与基坑距离的增加,地表沉降呈下降趋势,且随基坑持续施工,不同深度处的土体侧位移也随之增加,侧位移最大值均明显大于其他监测项目的变形值;通过变形分级判据得到深层侧位移的危险性等级相对最高,其次是墙顶变形和地表沉降,危险性等级为Ⅲ级;通过发展趋势判据,得到基坑趋势等级相对较低,仅为2级;根据不利原则叠加,确定安元西路站基坑的危险性评估等级为Ⅲ级,属预警状态。
Abstract:
In order to accurately grasp the deformation characteristics of deep foundation pit in the soft soil and reasonably evaluate its risk,based on the onsite monitoring results,the analysis on the spatial deformation characteristics of important monitoring items of the foundation pit was carried out.The corresponding characteristics indexes were calculated and obtained through the deformation classification criteria and development trend criteria,thus to carry out the risk assessment of foundation pit.The results showed that the spatial deformation of the supporting structure approximately presented the "hump" characteristic,that is,the deformation values at both ends of the foundation pit were relatively small,while the deformation value at the middle of the foundation pit was relatively large.The surrounding soil settlement was relatively small,with the increase of the distance from foundation pit,the ground settlement presented a descending trend,and as the construction of foundation pit continued,the lateral displacement of soil at different depths also increased,and the maximum lateral displacement was significantly greater than the deformation values of other monitoring items.Through the deformation classification criteria,it was obtained that the risk level of deep lateral displacement was relatively the highest,followed by the wall top deformation and the surface settlement,which was grade III.Through the development trend criteria,it was obtained that the trend level of foundation pit was relatively low,which was only grade 2.Both of them were superimposed according to the unfavorable principle,and the risk assessment level of the foundation pit in Anyuan West Road Station was determined to be level III,which was an early warning state.

参考文献/References:

[1]李淑,张顶立,邵运达.复杂环境下北京地铁车站深基坑变形时空规律研究[J].北京交通大学学报,2019,43(4):29-36. LI Shu,ZHANG Dingli,SHAO Yunda.Research onspatio-temporal law of deep excavation deformation under complicated environment in Beijing subway station[J].Journal of Beijing Jiaotong University,2019,43(4):29-36.
[2]奚家米,付垒.基于时空效应的深基坑工程变形规律分析[J].科学技术与工程,2019,19(16):290-297. XI Jiami,FU Lei.Analysis of deformation law of deep foundation pit based on space-time effect[J].Science Technology and Engineering,2019,19(16):290-297.
[3]林志斌,李元海,刘继强.软土基坑变形时空演化规律研究[J].现代隧道技术,2016,53(3):82-90,97. LIN Zhibin,LI Yuanhai,LIU Jiqiang.A study on the spatial-temporal evolution regularity of the reformation of a foundation pit in soft soil[J].Modern Tunnelling Technology,2016,53(3):82-90,97.
[4]潘梦真,虢成功.基于改进相互作用矩阵的基坑施工安全风险评价[J].中国安全生产科学技术,2020,16(3):125-130. PAN Mengzhen,GUO Chenggong.Safety evaluation of foundation pit construction based on improved interaction matrix[J].Journal of Safety Science and Technology,2020,16(3):125-130.
[5]卜康正,郑先昌,沈翔,等.基坑放坡开挖对下方既有地铁隧道影响计算及风险预测[J].中国安全生产科学技术,2019,15(7):5-12. BU Kangzheng,ZHENG Xianchang,SHEN Xiang,et al.Calculation for effect of foundation pit sloping excavation on underlying metro tunnels and risk prediction[J].Journal of Safety Science and Technology,2019,15(7):5-12.
[6]陈家骐,华建兵,段园煜,等.基于粒子群优化的DGM(1,1)模型在基坑变形安全预测中的研究[J].中国安全生产科学技术,2019,15(3):161-166. CHEN Jiaqi,HUA Jianbing,DUAN Yuanyu,et al.Study on DGM(1,1) model based on particle swarm optimization in predicting deformation safety of foundation pit[J].Journal of Safety Science and Technology,2019,15(3):161-166.
[7]张壮,孟宪国,秦拥军,等.土岩复合地层深基坑变形时空效应分析[J].科学技术与工程,2019,19(25):325-333. ZHANG Zhuang,MENG Xianguo,QIN Yongjun,et al.Analysis of space-time effect of deep foundation pit deformation in soil-rock composite stratum[J].Science Technology and Engineering,2019,19(25):325-333.
[8]于富才,张顶立,王文波,等.隧道围岩变形的时空特性研究[J].铁道学报,2020,42(3):139-146. YU Fucai,ZHANG Dingli,WANG Wenbo,et al.Study on space-time characteristics of surrounding rock deformation in tunnel engineering[J].Journal of the China Railway Society,2020,42(3):139-146.
[9]奚家米,尉阳.软土地区深基坑施工监测与变形特性的时空效应分析[J].科学技术与工程,2020,20(4):1587-1592. XI Jiami,WEI Yang.Time and space effect of construction monitoring and deformation characteristics of deep foundation pit in soft soil area[J].Science Technology and Engineering,2020,20(4):1587-1592.
[10]徐耀德,祝建勋,郭涛.基于多监测及预警要素的地铁工程安全风险量化评估方法[J].都市快轨交通,2018,31(6):13-17. XU Yaode,ZHU Jianxun,GUO Tao.A quantitative method based on multiple monitoring items and early warning factors for evaluation of metro engineering safety risks[J].Urban Rapid Rail Transit,2018,31(6):13-17.
[11]夏元友,陈春舒,陈金培,等.基于现场监测的深基坑施工动态风险评估[J].地下空间与工程学报,2016,12(5):1378-1384. XIA Yuanyou,CHEN Chunshu,CHEN Jinpei,et al.Dynamic risk assessment of deep foundation pit construction based on field monitoring[J].Chinese Journal of Underground Space and Engineering,2016,12(5):1378-1384.
[12]王飞,宋学文,赵会艳.基于现场监测数据分析的深基坑安全风险评价体系[J].公路,2016,61(11):11-16. WANG Fei,SONG Xuewen,ZHAO Huiyan.Safety risk assessment system of deep foundation pit based on field monitoring data analysis[J].Highway,2016,61(11):11-16.
[13]王雪妮,韩国锋.趋势项分离预测模型及重标度极差分析在深基坑变形预测中的应用研究[J].隧道建设,2017,37(8):990-996. WANG Xueni,HAN Guofeng.Study of application of trend term separation prediction model and rescaled range (R/S) analysis to deformation prediction of deep foundation pit[J].Tunnel Construction,2017,37(8):990-996.
[14]王娟,王兴科.组合预测及R/S分析在基坑变形趋势判断中的应用研究[J].长江科学院院报,2017,34(5):103-108. WANG Juan,WANG Xingke.Application of combinatorial forecasting and R/S analysis to determining foundation pit’s deformation trend[J].Journal of Yangtze River Scientific Research Institute,2017,34(5):103-108.
[15]庞建成,隆然,马娇.基于改进R/S分析方法的深基坑变形预报预测研究[J].施工技术,2015,44(13):56-59,63. PANG Jiancheng,LONG Ran,MA Jiao.Research on deformation predictions of foundation excavation based on BP neural network and improved the role of R/S analysis method[J].Construction Technology,2015,44(13):56-59,63.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2020-05-19
* 基金项目: 陕西铁路工程职业技术学院建筑施工技术科技创新团队基金项目(KJTD201804)
作者简介: 李常茂,硕士,副教授,主要研究方向为施工与项目管理。