|本期目录/Table of Contents|

[1]马海涛,张亦海,李京京.国内尾矿库物理模型试验研究现状分析*[J].中国安全生产科学技术,2020,16(12):61-66.[doi:10.11731/j.issn.1673-193x.2020.12.010]
 MA Haitao,ZHANG Yihai,LI Jingjing.Analysis on research status about physical model tests of tailings pond in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(12):61-66.[doi:10.11731/j.issn.1673-193x.2020.12.010]
点击复制

国内尾矿库物理模型试验研究现状分析*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年12期
页码:
61-66
栏目:
学术论著
出版日期:
2020-12-31

文章信息/Info

Title:
Analysis on research status about physical model tests of tailings pond in China
文章编号:
1673-193X(2020)-12-0061-06
作者:
马海涛张亦海李京京
(1.中国安全生产科学研究院,北京 100012;
2.陇南紫金矿业有限公司,甘肃 陇南 746000)
Author(s):
MA Haitao ZHANG Yihai LI Jingjing
(1.China Academy of Safety Science and Technology,Beijing 100012,China;
2.Longnan Zijin Mining Co.,Ltd.,Longnan Gansu 746000,China)
关键词:
尾矿库物理模拟溃坝研究现状
Keywords:
tailings pond physical simulation dam break research status
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2020.12.010
文献标志码:
A
摘要:
为提高尾矿库物理试验的科学性与可靠性,采用文献资料收集与分析方法,对国内尾矿库物理模型试验的研究现状与主要成果进行梳理和归纳;总结试验模型存在的问题与不足。结果表明:溃坝机理试验主要研究了管涌渗透、洪水漫顶、地震作用下的溃坝及其演化过程;下游演进试验主要揭示了溃坝过程中泥深、冲击力、流速、泄砂量、淹没范围等时空分布规律;稳定性评价试验主要利用物理试验得到的浸润线位置、尾砂沉积分布等数据建立数值模型,对尾矿库筑坝过程、不同工程状况下的稳定性进行分析;防护试验主要对坝体加筋及拦挡坝防护效果等进行研究。从溃坝机理与过程、溃坝主要影响因素、溃坝下泄物运移过程、物理模型设计和构建、监测技术和手段等方面提出相应的研究建议,供研究学者参考借鉴。
Abstract:
In order to improve the scientificity and reliability of the physical tests of tailings pond,the research status and main achievements of the physical model test of tailings pond in China were sorted out and summarize by using the literature document collection and analysis methods.The problems and shortcomings of the experimental model were summarized.The results showed that the research tests of dam break mechanism mainly studied the mechanism and evolution process of dam break caused by the piping seepage,flood topping,and earthquake action.The research tests of downstream evolution mainly focused on the mud depth,impact force,flow velocity,sand discharge amount,submerged range and other time and space distribution laws during the dam break process.The stability evaluation tests mainly used the data of the infiltration line position and tailings deposition distribution obtained from the physical tests to establish a numerical model,so as to analyze the stability of the dam construction process and different engineering conditions of the tailing pond.The protection tests mainly studied the reinforcement of the dam body and the protection effect of detention dam.The corresponding research suggestions were put forward from the aspects of the mechanism and process of dam break,the main influencing factors of dam break,the movement process of spilled material under the dam break,the design and construction of physical model,the monitoring technology and means,etc.,so as to provide reference for the researchers.

参考文献/References:

[1]AZAM S,LI Q.Tailings dam failure:a review last one hundred years[J].Waster GEO Technics,2010,12:50-53.
[2]柴敬,袁强,汪志力,等.物理模型试验方法的应用分析[J].西安科技大学学报,2013,33(5):505-511. CHAI Jing,YUAN Qiang,WANG Zhili,et al.Application analysis of physical model test method[J].Journal of Xi’an University of Science and Technology,2013,33(5):505-511.
[3]王协康,方铎.泥石流模型试验相似律分析[J].四川大学学报:工程科学版,2000,32(3):9-12. WANG Xiekang,FANG Duo.Study on laws of debris flow model similarity[J].Journal of Sichuan University:Engineering Science Edition,2000,32(3):9-12.
[4]COLEMAN S E,ANDREWS D P,WEBBY M G.Overtopping breaching of non-cohesive homogeneous embankments[J].Journal of Hydraulic Engineering,2004,128(9):829-838.
[5]DUPONT E,DEWALS B,ARCHAMBEAU P,et al.Experimental and numerical study of the breaching of an embankment dam[J].Journal of Bacteriology,2007,189(9):3645-3649.
[6]HANSON G J,TEMPLE D M,ROBINSON K M,et al.Over view of dam gully erosion research[J].International Journal of Sediment Research,2005,20(3):259-269.
[7]MORRIS M W,HASSAN M,KORTENHAUS A,et al.Modelling breach initiation and growth[R].Munich:Hr Wallingford Limited,2008.
[8]MORRIS M W.CADAM:concerted action on dam break modelling[R].Munich:Hr Wallingford Limited,2000.
[9]MORRIS M W,HASSAN M A A M,VASKINN K A.Conclusions and recommendations from the IMPACT Project WP2:breach formation[R].Munich:Hr Wallingford Limited,2004.
[10]匡尚富.天然坝溃决的泥石流形成机理及其数学模型[J].泥沙研究,1993(4):42-57. KUANG Shangfu.Formation mechanisms and prediction models of debris flow due to natural failures[J].Journal of Sediment Research,1993(4):42-57.
[11]赵天龙,陈生水,钟启明.尾矿坝溃决机理与溃坝过程研究进展[J].水利水运工程学报,2015(1):105-111. ZHAO Tianlong,CHEN Shengshui,ZHONG Qiming.Advances in studies of tailing dam break mechanism and process[J].Hydro-Science and Engineering,2015(1):105-111.
[12]潘建平,王笙屹,朱洪威.尾矿坝液化流滑破坏模型与稳定措施研究[J].金属矿山,2011(4):134-136. PAN Jianping,WANG Shengyi,ZHU Hongwei.Study on flow slide destruction models induced by seismic liquefaction and stabilizing measures of tailings dam[J].Metal Mine,2011(4):134-136.
[13]魏勇,赵安文,许开立.尾矿库坝基管涌破坏试验[J].金属矿山,2015(9):157-160. WEI Yong,ZHAO Anwen,XU Kaili.Failure experiment of tailings dam foundation piping[J].Metal Mine,2015(9):157-160.
[14]肖经光,姚美良,槐以高,等.上游式尾矿坝漫顶溃坝的溃口扩展机理[J].价值工程,2017,36(19):117-119. XIAO Jingguang,YAO Meiliang,HUAI Yigao,et al.Expansion mechanism of collapse gates of upstream tailings dam break due to overtopping[J].Value Engineering,2017,36(19):117-119.
[15]敬小非,尹光志,魏作安,等.尾矿坝垮塌机制与溃决模式试验研究[J].岩土力学,2011,32(5):1377-1384,1404. JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Model experimental study of collapse mechanism and broken mode of tailings dam[J].Chinese Journal of Rock and Soil Mechanics,2011,32(5):1377-1384,1404.
[16]楚金旺,宋会彬,张红武.尾矿库漫顶溃坝模型试验研究[J].中国矿山工程,2015,44(3):73-77. CHU Jinwang,SONG Huibin,ZHANG Hongwu.Experimental study on tailing dam break due to overtopping[J].China Mine Engineering,2015,44(3):73-77.
[17]曹帅,张红武,赵晨苏,等.变坝坡赤泥库漫顶溃坝模型试验研究[J].水利学报,2019,50(4):428-439. CAO Shuai,ZHANG Hongwu,ZHAO Chensu,et al.Experimental study on dam-break of a red mud reservoir with complex dam slopes[J].Journal of Hydraulic Engineering,2019,50(4):428-439.
[18]党显璋,高茂生,张力霆,等.不同堆积密实度下尾矿库洪水漫顶溃坝的模型试验研究[J].海洋地质前沿,2019,34(9):79-85. DANG Xianzhang,GAO Maosheng,ZHANG Liting,et al.Experimental study on the model of flood overtopping and dam break of a tailing pond under different deposit compactness[J].Marine Geology Frontuers,2019,34(9):79-85.
[19]杨玉婷,王光进,艾敏,等.尾矿库渗流溃坝模型试验研究[J].矿冶,2019,28(5):15-20. YANG Yuting,WANG Guangjin,AI Min,et al.Experimental study on dam break model of seepage in tailing reservoir[J].Mining and Metallurgy,2019,28(5):15-20.
[20]敬小非,尹光志,魏作安,等.基于不同溃口形态的尾矿坝溃决泥浆流动特性试验研究[J].岩土力学,2012,33(3):745-752. JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Study of tailings dam-break surges with floating slurry in model experiment in different collapse gates[J].Rock and Soil Mechanics,2012,33(3):745-752.
[21]尹光志,敬小非,魏作安,等.尾矿坝溃坝相似模拟试验研究[J].岩石力学与工程学报,2010,29(S2):3830-3838. YIN Guangzhi,JING Xiaofei,WEI Zuoan,et al.Experimental study of similar simulation of tailings dam-break[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(S2):3830-3838.
[22]刘磊,张红武,钟德钰,等.尾矿库漫顶溃坝模型研究[J].水利学报,2014,45(6):675-681. LIU Lei,ZHANG Hongwu,ZHONG Deyu,et al.Research on tailings dam break due to overtopping[J].Journal of Hydraulic Engineering,2014,45(6):675-681.
[23]邵军,甘莎莎,何新春.溃坝模拟试验在尾矿库环境风险评价中的应用[J].中国矿山工程,2016,45(2):64-67. SHAO Jun,GAN Shasha,HE Xincun.Application of dam break simulation test in environmental risk assessment of tailing pond[J].China Mine Engineering,2016,45(2):64-67.
[24]辛保泉,万露,耿龙龙,等.尾矿库溃坝室外模型试验及灾害预测分析[J].中国安全生产科学技术,2018,14(5):102-108. XIN Baoquan,WAN Lu,GENG Longlong,et al.Outdoor model tests and disaster prediction analysis of dam break in tailings reservoir[J].Journal of Safety Science and Technology,2018,14(5):102-108.
[25]张东明,郑彬彬,尹光志,等.高浓缩分级尾矿上游法堆坝及模型试验研究[J].岩土力学,2016,37(7):1832-1838,1867. ZHANG Dongming,ZHENG Binbin,YIN Guangzhi,et al.Model tests on upstream dam-building method using concentrated and classified tailings[J].Rock and Soil Mechanics,2016,37(7):1832-1838,1867.
[26]尹光志,李愿,魏作安,等.洪水工况下尾矿库浸润线变化规律及稳定性分析[J].重庆大学学报,2010,33(3):72-75,86. YIN Guangzhi,LI Yuan,WEI Zuoan,et al.Regularity of the saturation lines change and stability analysis of tailings dam in the condition of flood[J].Journal of Chongqing University,2010,33(3):72-75,86.
[27]敬小非,尹光志,魏作安,等.模型试验与数值模拟对尾矿坝稳定性综合预测[J].重庆大学学报,2009,32(3):308-313. JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Model test and numerical simulation of tailing dam safety forecasting[J].Journal of Chongqing University,2009,32(3):308-313.
[28]张敏哲,金爱兵,王志凯,等.尾矿坝稳定性物理模型试验研究[J].金属矿山,2013(12):115-117. ZHANG Minzhe,JIN Aibing,WANG Zhikai,et al.On the physical model tests of tailings dam stability[J].Metal Mine,2013(12):115-117.
[29]张卫中,康钦容,曹冠森,等.云南某铜尾矿库不同堆坝速率稳定性分析[J].金属矿山,2016(11):39-42. ZHANG Weizhong,KANG Qinrong,CAO Guansen,et al.Stability analysis of different construction rates of a copper tailings dam in Yunnan province[J].Metal Mine,2016(11):39-42.
[30]赵一姝,敬小非,周筱,等.筋带对尾矿坝漫坝破坏过程阻滞作用试验研究[J].中国安全科学学报,2016,26(1):94-99. ZHAO Yishu,JING Xiaofei,ZHOU Xiao,et al.Experimental study on blocking action of bar strip on tailings dam overtopping[J].China Safety Science Journal,2016,26(1):94-99.
[31]尹光志,魏作安,万玲,等.细粒尾矿堆坝加筋加固模型试验研究[J].岩石力学与工程学报,2005,24(6):1030-1034. YIN Guangzhi,WEI Zuoan,WAN Ling,et al.Test study on stability of fine grained tailings dam in geo-grid reinforcement situation[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(6):1030-1034.
[32]敬小非,周筱,赵一姝,等.筋带密度对尾矿坝漫顶破坏规律影响研究[J].中国安全生产科学技术,2016,12(8):68-74. JING Xiaofei,ZHOU Xiao,ZHAO Yishu,et al.Impact study on spacing of geogrid of tailing dam break due to overtopping[J].Journal of Safety Science and Technology,2016,12(8):68-74.
[33]唐建新,尹光志,魏作安,等.龙都尾矿库细粒尾矿堆坝模型试验研究[J].中国矿业,2004,13(1):55-57. TANG Jianxin,YIN Guangzhi,WEI Zuoan,et al.Model test study of fine grained tailings dam of Longdu tailings pone[J].China Mining Magazine,2004,13(1):55-57.

相似文献/References:

[1]李全明,田文旗,王云海,等.尾矿库在线监测系统中位移数据分析方法探讨[J].中国安全生产科学技术,2011,7(8):47.
 LI Quan-ming,TIAN Wen-qi,WANG Yun-hai.Study on displacement analysis methods of tailing ponds on-line monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):47.
[2]许元木.浅谈尾矿坝削坡[J].中国安全生产科学技术,2011,7(11):132.
 XU Yuan-mu.A superficial analysis on tailings dam cutting slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):132.
[3]梅国栋,吴宗之.尾矿库溃坝风险定量评价方法探讨[J].中国安全生产科学技术,2012,8(2):78.
 MEI Guo dong,WU Zong zhi.Discussion on quantitative assessment method of dam failure risks in tailings dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):78.
[4]孙恩吉,张兴凯,李仲学,等.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5.
 SUN En ji,ZHANG Xing kai,LI Zhong xue,et al.Simulation analysis on tailings dam saturated and semisaturation infiltration of under rainfall conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):5.
[5]李钢.基于灰色系统理论的尾矿库坝体 形变位移预测方法[J].中国安全生产科学技术,2012,8(4):107.
 LI Gang.Research on the displacement forecasting methods of tailings dam deformation based on the gray system theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):107.
[6]梅国栋.尾矿库溃坝灾害脆弱性评估指标体系及方法研究[J].中国安全生产科学技术,2012,8(12):11.
 MEI Guo dong.Research on the dambreak hazard vulnerability assessment index system and methods of tailings pond[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):11.
[7]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10.
 CAI Shi Jing,ZHANG Dong,WU Zong Zhi.Discussion on Tailings Reservoir Dam fuzzy risk assessment model Under Seismic Conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):10.
[8]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17.
 ZHANG Dong,WU Zong-zhi,CAI Shi-jing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):17.
[9]梅国栋,王云海.我国尾矿库事故统计分析与对策研究[J].中国安全生产科学技术,2010,6(3):211.
 MEI Guo-dong,WANG Yun-hai.Statistic analysis and countermeasure study on tailings pond accidents in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):211.
[10]郭朝阳,唐治亚.尾矿库溃坝模型探讨[J].中国安全生产科学技术,2010,6(1):63.
 GUO Chao-yang,TANG Zhi-ya.Study on the tailings dam-break model[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):63.

备注/Memo

备注/Memo:
收稿日期: 2020-08-10
* 基金项目: 国家重点研发计划项目(2017YFC0804603)
作者简介: 马海涛,博士,高级工程师,主要研究方向为非煤矿山安全及尾矿库溃坝机理研究。
通信作者: 张亦海,博士,工程师,主要研究方向为露天矿山边坡安全及滑坡预警预报。
更新日期/Last Update: 2021-01-08