|本期目录/Table of Contents|

[1]马辉,张红滨,王艳娜.基于BIM的装配式建筑并行施工作业空间冲突识别[J].中国安全生产科学技术,2020,16(2):97-103.[doi:10.11731/j.issn.1673-193x.2020.02.016]
 MA Hui,ZHANG Hongbin,WANG Yanna.Conflict recognition on working space in concurrent construction of prefabricated building based on BIM[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(2):97-103.[doi:10.11731/j.issn.1673-193x.2020.02.016]
点击复制

基于BIM的装配式建筑并行施工作业空间冲突识别
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年2期
页码:
97-103
栏目:
职业安全卫生管理与技术
出版日期:
2020-02-29

文章信息/Info

Title:
Conflict recognition on working space in concurrent construction of prefabricated building based on BIM
文章编号:
1673-193X(2020)-02-0097-07
作者:
马辉张红滨王艳娜
(天津城建大学 经济与管理学院,天津 300384)
Author(s):
MA Hui ZHANG Hongbin WANG Yanna
(School of Economics and Management,Tianjin Chengjian University,Tianjin 300384,China)
关键词:
施工安全装配式建筑作业空间冲突空间冲突识别
Keywords:
construction safety prefabricated buildings working space conflict space conflict recognition
分类号:
X947;TU714
DOI:
10.11731/j.issn.1673-193x.2020.02.016
文献标志码:
A
摘要:
为识别装配式建筑施工并行作业之间的空间冲突,分析装配式建筑施工项目现场各类作业空间占用需求,利用BIM技术模拟作业空间占用,引入混合轴向包围盒(AABB)与有向包围盒(OBB)算法,建立施工现场并行作业空间冲突检测模型。结果表明:所建立的模型可有效预测施工现场并行作业之间的空间冲突,为进一步的空间资源优化与项目安全管理提供支撑。
Abstract:
To identify the space conflict between the concurrent operations in the construction of prefabricated building,the occupancy requirements of various working spaces on the construction project site of prefabricated building were analyzed.The working space occupancy was simulated by using the building information modeling (BIM) technology,and a detection model for the space conflict of concurrent operations on the construction site was established by introducing into the axisaligned bounding box (AABB) and orientational bounding box (OBB).The results showed that the proposed model could effectively predict the space conflict between the concurrent operations on the construction site,and it provides support for the further spatial resource optimization and project safety management.

参考文献/References:

[1]陶莎,盛昭瀚.带有多重空间干涉约束的工程调度优化[J].系统管理学报,2018,27(1):64-71. TAO Sha,SHENG Zhaohan.Construction scheduling optimization with multiple spatial interference constraints[J].Journal of System & Management,2018,27(1):64-71.
[2]宗胜亮,柴国荣.考虑安全的空间受限工程项目调度优化[J].科技管理研究,2017,37(3):185-189. ZONG Shengliang,CHAI Guorong.Scheduling optimization of space limited project by taking safety into consideration[J].Science and Technology Management Research,2017,37(3):185-189.
[3]周迎,周诚,万能.基于线形图的地铁工程4D进度控制系统研究与应用[J].土木工程学报,2011,44(S1):209-214. ZHOU Ying,ZHOU Cheng,WAN Neng.Research and application of 4D schedule control system for metro projects based on linear graph[J].Journal of Civil Engineering,2011,44 (S1):209-214.
[4]王要武,卢伟倬.高层建筑工作流优化与可视化系统研究[J].科技进步与对策,2008,10:146-149. WANG Yaowu,LU Weizhuo.Research on work flow optimization and visualization system of high-rise buildings[J].Scientific and Technological Progress and Countermeasures,2008,10:146-149.
[5]SU X,CAI H B.Life cycle approach to construction modeling and planning[J].Journal of Construction Engineering and Management,2014,140(7):04014019.
[6]MALLASI Z.Dynamic quantification and analysis of the construction workspace congestion utilizing 4D visualization[J].Automation in Construction,2006,15(5),640-655.
[7]NASHWAN D,MALLASI Z.Construction workspace planning:assignment and analysis utilizing 4D visualization technologies[J].Computer-Aided Civil Infrastructure Engineering,2006,21(7):498-513.
[8]HUANG T,KONG C W,GUO H,et al.A virtual prototyping system for simulating construction processes[J].Automation in Construction,2007,16(5),576-585.
[9]CHOI B,LEE H,PARK M,et al.Framework for work-space planning using 4D BIM in construction projects[J].Journal of Construction Engineering and Management,2014,140 (9):04014041.
[10]ZHANG C,AMIN H,TAREK M Z,et al.Cell-based representation and analysis of spatial resources in construction simulation[J].Automation in Construction,2007,16:436-448.
[11]AKINCI B,FISCHER M,KUNZ J.Automated generation of work spaces required by construction activities[J].Journal of Construction Engineering and Management,2002,128(4):306-315.
[12]KEVIN T,BURCU A.Automated generation of workspace requirements of mobile crane operations to support conflict detection[J].Automation in Construction,2007,16:262-276.
[13]MOON H S,DAWOOD N,KANGL S.Development of workspace conflict visualization system using 4D object of work schedule[J].Advanced Engineering Informatics,2014,28(1):50-65.
[14]ALI M,FARNAD N,MAJID P J,et al.4D-BIM dynamic time-space conflict detection and quantification system for building construction projects[J].Journal of Construction Engineering and Management,2018,144(7):04018056.
[15]王仁超,杨弢,吴艳.空间分析理论在水利水电工程安全问题研究中的应用[J].水利水电技术,2004,35(5):52-55. WANG Renchao,YANG Tao,WU Yan.Application of spatial analysis theory in the study of safety issues in water conservancy and hydropower projects[J].Water Resources and Hydropower Engineering,2004,35(5):52-55.
[16]FRANCISCO J M,NGEL A,FRANCISCO R F.Fast collision detection between high resolution polygonal models[J].Computers & Graphics,2019,83(10):97-106.
[17]DING S,MANNAN M A,POO A N.Oriented bounding box and octree based global interference detection in 5-axis machining of free-form surfaces[J].Computer-Aided Design,2004,36(13):1281-1294.
[18]YUR Y,ZHAO J L,YU L,et al.Collision detection algorithm based on AABB bounding box and space division [J].Journal of Image and Graphics,2018,23:1925-1937.
[19]GOTTSCHALK S,LIN M,MANOCHA D.OBB-tree:a hierarchical structure for rapid interference detection[J].In:Proc.SIGGRAPH,1996,171-80.
[20]PENG L,FENG Z Q,JOLI P,et al.Automatic contact detection between rope fibers [J].Computer & Structures,2019,218(7),82-93.

相似文献/References:

[1]宋四新 ,宋先勇.大型排架施工安全监控机制研究[J].中国安全生产科学技术,2012,8(6):101.
 SONG Si xin,SONG Xian yong.Research on safety monitoring mechanism of largescale bent frame construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):101.
[2]鲍学英,王起才,宫文昌.基于模糊层次分析法的地铁工程施工安全评价[J].中国安全生产科学技术,2013,9(1):136.
 BAO Xue ying,WANG Qi cai.Study on safety assessments of metro constructions using fuzzy analytic hierarchy process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):136.
[3]黄丽霞,张东曾.悬索桥钢箱梁的吊装施工安全技术研究[J].中国安全生产科学技术,2010,6(3):228.
 HUANG Li-xia,ZHANG Dong-zeng.Study on the safe hoisting techniques for steel box girder of suspension bridge[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):228.
[4]袁春燕,杨剑耕,卢俊龙.模糊测度理论在施工现场安全目标决策中的应用[J].中国安全生产科学技术,2014,10(3):101.[doi:10.11731/j.issn.1673-193x.2014.03.017]
 YUAN Chun yan,YANG Jian geng,LU Jun long.Application of fuzzy measure theory in safety objective decision of construction site[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(2):101.[doi:10.11731/j.issn.1673-193x.2014.03.017]
[5]杨高升,李松晨,姜双双.建筑施工企业安全激励机制优化研究[J].中国安全生产科学技术,2014,10(6):133.[doi:10.11731/j.issn.1673-193x.2014.06.021]
 YANG Gao sheng,LI Song chen,JIANG Shuang shuang.Research on optimization of safety incentive mechanism in construction enterprises[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(2):133.[doi:10.11731/j.issn.1673-193x.2014.06.021]
[6]郭红领,张伟胜,刘文平.集成设计-施工安全(DFCS)的方法探索[J].中国安全生产科学技术,2015,11(2):5.[doi:10.11731/j.issn.1673-193x.2015.02.001]
 GUO Hong-ling,ZHANG Wei-sheng,LIU Wen-ping.Exploration on integration method of design for construction safety(DFCS)[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(2):5.[doi:10.11731/j.issn.1673-193x.2015.02.001]
[7]韩豫,张泾杰,梅强,等.建筑工人安全行为习惯的塑造策略与方法[J].中国安全生产科学技术,2015,11(9):177.[doi:10.11731/j.issn.1673-193x.2015.09.028]
 HAN Yu,ZHANG Jing-jie,MEI Qiang,et al.Shaping strategies and methods of safety behavior habits for construction workers[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(2):177.[doi:10.11731/j.issn.1673-193x.2015.09.028]
[8]郑霞忠,陈云,陈述.溧阳电站整流锥支撑系统施工安全影响因素识别研究[J].中国安全生产科学技术,2016,12(3):137.[doi:10.11731/j.issn.1673-193x.2016.03.025]
 ZHENG Xiazhong,CHEN Yun,CHEN Shu.Recognition of influence factors on construction safety for support system of air flow distributing wimble in Liyang power station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(2):137.[doi:10.11731/j.issn.1673-193x.2016.03.025]
[9]韩豫,梅强,周丹,等.群体封闭性视角下的建筑工人不安全行为传播特[J].中国安全生产科学技术,2016,12(3):187.[doi:10.11731/j.issn.1673-193x.2016.03.034]
 HAN Yu,MEI Qiang,ZHOU Dan,et al.Propagation characteristics of unsafe behaviors for construction workers from the perspective of group closeness[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(2):187.[doi:10.11731/j.issn.1673-193x.2016.03.034]
[10]韩豫,张泾杰,孙昊,等.基于图像识别的建筑工人智能安全检查系统设计与实现[J].中国安全生产科学技术,2016,12(10):142.[doi:10.11731/j.issn.1673-193x.2016.10.024]
 HAN Yu,ZHANG Jingjie,SUN Hao,et al.Design and implementation of intelligent safety inspection system for construction workers based on image recognition[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(2):142.[doi:10.11731/j.issn.1673-193x.2016.10.024]
[11]张跃斌,易欣,宋璋玉,等.基于SD的装配式建筑施工安全监管演化博弈研究*[J].中国安全生产科学技术,2022,18(3):149.[doi:10.11731/j.issn.1673-193x.2022.03.023]
 ZHANG Yuebin,YI Xin,SONG Zhangyu,et al.Research on evolutionary game of safety supervision for prefabricated building construction based on SD[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(2):149.[doi:10.11731/j.issn.1673-193x.2022.03.023]
[12]周逸伦,王人龙,佘健俊.三度空间视角下的装配式建筑施工安全绩效评价*[J].中国安全生产科学技术,2022,18(9):210.[doi:10.11731/j.issn.1673-193x.2022.09.030]
 ZHOU Yilun,WANG Renlong,SHE Jianjun.Safety performance evaluation of prefabricated building construction from perspective of three-dimensional space[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(2):210.[doi:10.11731/j.issn.1673-193x.2022.09.030]

备注/Memo

备注/Memo:
收稿日期: 2019-08-27
* 基金项目: 教育部人文社会科学研究青年基金项目(18YJC630121);天津市高等学校创新团队“建筑工业化与绿色发展”项目(TD13-5006);天津市科技重大专项与工程项目(17ZXCXSF00040)
作者简介: 马辉,博士,副教授,主要研究方向为工程项目安全管理、绿色建筑。
更新日期/Last Update: 2020-03-16