[1]许有俊,王雅建,冯超,等.矩形顶管施工引起的地面沉降变形研究[J].地下空间与工程学报,2018,14(1):192-199.
XU Youjun,WANG Yajian,FENG Chao,et al.Research on ground deformation caused by rectangular ripe jacking construction[J].Chinese Journal of Underground Space and Engineering,2018,14(1):192-199.
[2]葛春辉. 顶管工程设计与施工[M]. 北京:中国建筑工业出版社, 2012.
[3]彭立敏, 王哲, 叶艺超,等. 矩形顶管技术发展与研究现状[J]. 隧道建设, 2015, 35(1):1-8.
PENG Limin,WANG Zhe,YE Yichao,et al.Technology development and research status of rectangular roof tube[J].Tunnel Construction,2015,35(1):1-8.
[4]魏纲,周洋,魏新江.盾构隧道施工引起的工后地面沉降研究[J].岩石力学与工程学报,2013,32(S1):2891-2896.
WEI Gang,ZHOU Yang,WEI Xinjiang.Research on post-construction surface settlement caused by shield tunneling[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(S1):2891-2896.
[5]房营光, 莫海鸿, 张传英. 顶管施工扰动区土体变形的理论与实测分析[J]. 岩石力学与工程学报, 2003, 22(4):601-605.
FANG Yingguang,MO Haihong,ZHANG Chuanying.Theoretic and testing analysis soil deformation in the area of disturbance caused by pipe-jacking[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(4):601-605.
[6]韩煊.隧道施工引起地层位移及建筑物变形预测的实用方法研究[D].西安:西安理工大学,2007.
[7]魏纲,黄志义,徐日庆,等.顶管施工引起地面变形的计算方法研究[J].岩石力学与工程学报,2005(S2):5808-5815.
WEI Gang,HUANG Zhiyi,XU Riqing,et al.Study on calculation methods of ground deformation induced by pipe jacking construction[J].Chinese Journal of Rock Mechanics and Engineering,2005(S2),5808-5815.
[8]王日东.矩形顶管施工引起的土体变形计算方法研究[J].佳木斯大学学报(自然科学版),2014,32(5):711-714.
WANG Ridong.Calculation methods of soil deformation induced by rectangular pipe jacking construction[J].Journal of Jiamusi University(Natural Science Edition),2014,32(5):711-714.
[9]韩煊, 李宁. 隧道开挖不均匀收敛引起地层位移的预测模型[J]. 岩土工程学报, 2007, 29(3):347-352.
HAN Xuan,LI Ning.A predicting model for ground movement Induced by non-uniform convergence of tunnel[J].Chinese Journal of Geotechnical Engineering,2007,29(3):347-352.
[10]韩煊, 李宁. 隧道施工引起地层位移预测模型的对比分析[J]. 岩石力学与工程学报, 2007, 26(3):594-600.
HAN Xuan,LI Ning.Comparative analysis of strata prediction models for ground movement induced tunnel construction[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(3):594-600.
[11]王育鹏, 蔡叶. 实例分析港口施工中的大口径长距离土压平衡顶管掘进技术[J]. 中国水运(下半月), 2015(10):279-280.
WANG Yupeng,CAI Ye.An example is given to analyze the tunneling technique of large diameter long distance earth pressure balance in port construction[J].China Water Transportat(The Second Half),2015,15(10):279-280.
[12]任军锋.浅谈土压平衡机械顶管施工控制管理技术[J]. 科学创业家,2014,26(7):33-35.
REN Junfeng.A brief discussion on the construction control technology of soil pressure balance mechanical pipe jacking[J].Technological Pioneers,2014,26(7):33-35.
[13]刘招伟, 杨朝帅. 矩形顶管隧道施工中触变泥浆套形成规律及减阻效果试验[J]. 河南理工大学学报(自然科学版), 2016, 35(4):568-576.
LIU Zhaowei,YANG Chaoshuai.Forming law of thixotropic mud holster and test of reducing resistance effect in rectangular pipe jacking tunnel construction[J].Journal of henan polytechnic university(Natural Science),2016,35(4):568-576.
[14]李笑, 刘春虎. 土压平衡盾构土压平衡比控制的模拟试验研究[J]. 现代隧道技术, 2011, 48(4):83-86.
LI Xiao,LIU Chunhu.Simulated experimental study on earth-pressure-balance ratio control
forearth pressure balanced shields[J].Modern Tunnelling Technology,2011,48(4):83-86.