[1]彭承英.尾矿库事故及预防措施[J].有色矿山,1996(5):38-40.
PENG Chengying.Tailings reservoir accidents and preventive measures [J].Journal of Coloured Mines,1996(5):38-40.
[2]于广明,宋传旺,潘永站,等.尾矿坝安全研究的国外新进展及我国现状和发展态势[J].岩石力学与工程学报,2014,33(增刊1):3238-3248.
YU Guangming,SONG Chuanwang,PAN Yongzhan,et al.Review of new progress in tailing dam safety in foreign research and current state with development trent in China[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(Supplement 1):3238-3248.
[3]巴西溃坝事故遇难人数升至235人 仍有35人失踪[EB/OL].(2019-05-05)[2025-02-25].https://www.chinanews.com.cn/gj/2019/05-05/8827292.shtml.
[4]李宗伟,孙丹,尹大娟.吊水壶尾矿坝渗流特性三维有限元分析[J].中国安全生产科学技术,2012,8(6):65-69.
LI Zongwei,SUN Dan,YIN Dajuan.Analysis on seepage behavior of Diaoshuihu tailing dam by 3-D FEM[J].Journal of Safety Science and Technology,2012,8(6):65-69.
[5]ZANDARIN M T,OLDECOP L A,RODRIGUEZ R,et al.The role of capillary water in the stability of tailing dams[J].Engineering Geology,2009,105(1):108-118.
[6]BUSSIERE B,CHAPUIS R P,AUBERTIN M.Unsaturated flow modeling for exposed and covered tailings dams[C]//Proceedings of the International Symposium on Major Challenges in Tailings Dams.Montréal:[s.n.],2003,15:57-70.
[7]付永祥,何秉顺.某高尾矿坝设计期渗流与稳定分析[J].中国安全生产科学技术,2009,5(5):67-71.
FU Yongxiang,HE Bingshun.The seepage computation and stability analysis for a high upstream tailings dam in the design period[J].Journal of Safety Science and Technology,2009,5(5):67-71.
[8]孙恩吉,张兴凯,李仲学,等.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5-8.
SUN Enji,ZHANG Xingkai,LI Zhongxue,et al.Simulation analysis on tailings dam saturated and semi-saturation infiltration of under rainfall conditions[J].Journal of Safety Science and Technology,2012,8(3):5-8.
[9]陈生水,邓曌,钟启明.连续降雨下尾矿库失稳溃坝数学模型研究与应用[J].金属矿山,2016(10):165-170.
CHEN Shengshui,DENG Zhao,ZHONG Qiming.Research on the mathematical model of tailings dam breachingdue to continuous rainfall and its application[J].Metal Mine,2016(10):165-170.
[10]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10-14.
CAI Sijing,ZHANG Dong,WU Zongzhi.Discussion on fuzzy risk assessment method of tailings reservoir dam break under seismic conditions[J].Journal of Safety Science and Technology,2011,7(7):10-14.
[11]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17-22.
ZHANG Dong,WU Zongzhi,CAI Sijing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].Journal of Safety Science and Technology,2010,6(6):17-22.
[12]王文松,尹光志,魏作安,等.高烈度地震区细粒尾矿上游法筑坝动力反应与稳定性分析[J].岩石力学与工程学报,2017,36(5):1201-1214.
WANG Wensong,YIN Guangzhi,WEI Zuoan,et al.Analysis of the dynamic response and stability of fine grained tailings dam by upstream embankment method in the area of high intensity earthquake[J].Chinese Journal of Rock Mechanics and Engineering,2017,36(5):1201-1214.
[13]CHAKRABORTY D,CHOUDHURY D.Investigation of the behavior of tailings earthen dam under seismic conditions[J].American Journal of Engineering and Applied Sciences,2009,29(3):559-564.
[14]沃庭枢,汪贻水,肖垂斌,等.尾矿库手册[M].北京:冶金工业出版社,2013.
[15]安志宏,聂洪峰,王吴,等.ZY-102C星数据在矿山遥感监测中的应用研究与分析[J].国土资源遥感,2015(2):174-182.
AN Zhihong,NIE Hongfeng,WANG Wu,et al.Application of ZY-102C satellite data in mine remote sensing monitoring [J].Remote Sensing of Land and Resources,2015(2):174-182.
[1]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17.
ZHANG Dong,WU Zong-zhi,CAI Shi-jing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(3):17.
[2]郑锐,杨振宏,潘成林.基于熵技术的尾矿库安全模糊综合评价体系研究[J].中国安全生产科学技术,2011,7(6):107.
ZHENG Rui,YANG Zhen-hong,PAN Cheng-lin.Reaserch on Fuzzy Comprehensive Evaluation System of Tailings Based on Entropy Technology[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):107.
[3]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10.
CAI Shi Jing,ZHANG Dong,WU Zong Zhi.Discussion on Tailings Reservoir Dam fuzzy risk assessment model Under Seismic Conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):10.
[4]李全明,田文旗,王云海,等.尾矿库在线监测系统中位移数据分析方法探讨[J].中国安全生产科学技术,2011,7(8):47.
LI Quan-ming,TIAN Wen-qi,WANG Yun-hai.Study on displacement analysis methods of tailing ponds on-line monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):47.
[5]许元木.浅谈尾矿坝削坡[J].中国安全生产科学技术,2011,7(11):132.
XU Yuan-mu.A superficial analysis on tailings dam cutting slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):132.
[6]梅国栋,吴宗之.尾矿库溃坝风险定量评价方法探讨[J].中国安全生产科学技术,2012,8(2):78.
MEI Guo dong,WU Zong zhi.Discussion on quantitative assessment method of dam failure risks in tailings dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):78.
[7]孙恩吉,张兴凯,李仲学,等.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5.
SUN En ji,ZHANG Xing kai,LI Zhong xue,et al.Simulation analysis on tailings dam saturated and semisaturation infiltration of under rainfall conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):5.
[8]李钢.基于灰色系统理论的尾矿库坝体
形变位移预测方法[J].中国安全生产科学技术,2012,8(4):107.
LI Gang.Research on the displacement forecasting methods of tailings
dam deformation based on the gray system theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):107.
[9]梅国栋.尾矿库溃坝灾害脆弱性评估指标体系及方法研究[J].中国安全生产科学技术,2012,8(12):11.
MEI Guo dong.Research on the dambreak hazard vulnerability assessment index system and methods of tailings pond[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):11.
[10]梅国栋,王云海.我国尾矿库事故统计分析与对策研究[J].中国安全生产科学技术,2010,6(3):211.
MEI Guo-dong,WANG Yun-hai.Statistic analysis and countermeasure study on tailings pond accidents in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(3):211.